Hot Liquid Asphalt Tanker Trailer Truck 50, 000 Liters with Two Burner Heater Insulation Layer for Transport Bitumen, Liquid Asphalt, Coal Tar Oil, Crude Oil

Min.Order: 1
Product origin: Suizhou, Hubei, China
Infringement complaint: complaintComplaint
US$ 23500 ~ 39800

Description

Hot Liquid Asphalt Tanker  Trailer Truck 50,000 liters With Two Burner Heater    Insulation Layer For Transport Bitumen,Liquid Asphalt,Coal Tar Oil,Crude Oil

50,000 liters 3 axle bitumen insulation tank semi-trailer 
Tank volume: 50,000 liters 
Tanker material: Carbon steel-Q235A 
Tank medium: Bitumen,liquid asphalt,coal tar oil,crude oil 
No.of axle: 3 axle BPW or FUWA 
Heating system: 2 BALTUR TBL45P ITALY burner heating 
Insulation layer: Rock wool 80mm and outer stainless steel cold plate


 Ask for better price 

The pictures are for your reference only. 

















 

     

        Asphalt tanker truck / trailer/ tank containers

     

        applied to transport liquid asphalt in a short or long distance. It's an ideal equipment to transport asphalt from asphalt storage depot to asphalt plant, and transport asphalt from oil refinery and wharf to asphalt storage depot. Besides the above functions, also suitable to transport crude oil and residual oil and viscous oil

     

        1. lower center of gravity, driving stably and safely.

     

        2. Rock wool insulation100mm, average temp. drop<1°C/h.

     

        3. equipped with diesel-oil Burner and a 4. Equipped 220V generator, supply continuous power for systems.

     

        5. Reliable monitoring system of heating.

     

        6. Stainless steel tank shell or cold plate

      7. Heating and control functions can be on semi-trailer, and be independently used on tractor.OEM ,OBM, ODM HEATED BITUMEN TANK ,HEATED ASPHALT TANK Trailer         

       

   
     

        Tare Weight(kg)

   
     

        12500

   
     

        Pay Load(kg)

   
     

        45000

   
     

        Total Weight(kg)

   
     

        57000

   
     

        LxWxH (mm)

   
     

        12000x2495x3680

   
     

        Wheelbase(mm)

   
     

        6800+1310+1310

   
     

        Tanker

   
     

        Shape

   
     

        Cylinder,roundness,etc

   
     

        Total Volume(m3)

   
     

        50

   
     

        Valid Volume(m3)

   
     

        50

   
     

        Material

   
     

        Q235A/6mm

   
     

        End plate

   
     

        Q235A/8mm, by punching

   
     

        Isolated steel plate

   
     

        Q235A/6mm, 20 inch manhole

   
     

        Parts for Tank

   
     

        Manhole cover

   
     

        2 sets of 500mm/Q235 manhole fixed on top of Tank,

     

        with breather valve

   
     

        Unloading valve

   
     

        2 sets of DN80 fixed at bottom of Tank

   
     

        Pipeline at bottom of tank

   
     

        4seamless steel tube/Q235

   
     

        Anti-static electricity

     

        system

   
     

        pulling, wire carrier, sheet copper (6 sheet-standard layout)

   
     

        Other Parts

   
     

        Ladder

   
     

        2 unit at front and rear of Tank

   
     

        Guard on top of Tank

   
     

        Zinc galvanized guard- net

   
     

        Oil hose box

   
     

        single hole tube, 1 unit on each side

   
     

        Oil hose

   
     

        2 unit, 3x 6m size in black rubber

   
     

        Side guard

   
     

        cross bar-structure

   
     

        Rear bottom guard

   
     

        Fixed type

   
     

        Work tank deck

   
     

        Box type

   
     

        Fire extinguisher box

   
     

        2 unit at the back of each side

   
     

        Mud guard

   
     

        Steel structure in trapezoid form

   
     

        Lights and wire

   
     

        24V, 7 coils with lights for parking, reverse, instruction,head lamp and end lamp

   
     

        Chassis

   
     

        Main Beam

   
     

        Heavy duty and extra durability designed;Opting for high tensile steel

     

        Q345B,welded by automatic Submerged-Arc processes

   
     

        Axle

   
     

        3 units of FUWA(band) or BPW or L1

     

        Axle load capacity:13 ton/axle

   
     

        Landing Gear

   
     

        JOST Brand two Speed Manual Operation

   
     

        King Pin

   
     

        JOST brand,one unit of 2SAE standard Jost bolt-in king pin

   
     

        Suspension

   
     

        FUWA(band) mechanical tandem suspension with 16mm x 90mm

     

         8 leafs spring

   
     

        Pneumatic Braking System

   
     

        A system with emergency brake and parking brake;

     

        Dual line - air brake, piggyback spring on all axles;

     

        One units of WABCO RE 6 relay valve; four units of T30/30 chamber;

     

        one units of 40L air tank,two units of standard copper airconnector.

   
     

        Wheel rim

   
     

        12 units of 8.25R22.5 rim

   
     

        Tire

   
     

        12 units of 11R22.5 tubeless tyre

   
     

        Painting

   
     

        Sand blasting processing on rust cleaning

     

        One coat of anticorrosive

     

        Two coats of finish urethane paint

     

        Colour as customer choice

   
     

        Heating and insulation system

     

        of tanker

   
     

        Insulating layer

     

        1. Tank containing keep warm by insulation layer

     

        2. Insulation layer composed of: 80mm rock wool and 1.2mm

     

        stainless cold plate covered, it can prevent the heat losing.

     

        Heating system

     

        1.Use Burner heater 24 hours continuous heating at back of the tanker

     

        2 Italian BALTUR diesel oil burner

     

        Capacity: 14*104Kcal/h, brand-new

     

        3. One general-purpose diesel generator

     

        4.According to continuous diesel burning to keep warm

     

        for the crude oil (Diesel consumption:150kg/24hours)

     

        Note: It's not necessary to adopt 24 hours continuous burning,

     

        you just only need begin to heat ahead of 2-3 hours while approach the

     

        destination site.It will save oil consumption and cost for you

   
Certifications

Packaging & Shipping


 


 

 

Product Tag:
Related categories:
Scroll to Top