Lightweight Precast EPS Fly Ash Cement Sandwich Wall Panel Machine

Min.Order: 1
Product origin: Linyi, Shandong, China
Infringement complaint: complaintComplaint
US$ 100000 ~ 500000

Description
Product Description

precast concrete molds for sandwich foam panel making machine 
 
EPS sandwich panel machine line is in order to adapt to recent development trend of building materials, our company bold innovation design of highly automated production lines, which enables the waste water and materials be reused through elaborate design.
This is our unique design, can full automatically demoulding, 20panels/time. So can save a lot of your labor cost .






 

Machinery Parameters
Capacity20,000sqm~600,000sqm per year
Thickness50-250mm thickness. special sizes need to be customized
Length2440~3600mm, special sizes need to be customized
Width610mm , special sizes need to be customized
Raw materiaThere are mainly two different types
1. Cement+fly ash/eps/ceramsite/sand, etc (optional, can choose to add or not add)
2. Fomed cement+additives
Finished board type1. Composite board/sandwich board, with surface board
2. Lightweight solid panel, without furface board
Surface board types1. Calcium silicate board
2. Fiber cement board
3. Mgo board
Electrical componentsThere are mainly two different types

Flow chart of lightweight eps automatic sandwich panel making machine

 
Main Features:
1) Simple structure in linear type ,easy in installation and maintation. 
2) Adopting advanced world famous brand components in pneumatic parts ,electric parts and operation parts. 
3) High pressure double crank to control the die opening and closing. 
4) Running in a high automatization and intellectualization,no pollution 
5) Apply a linker to connect with the air conveyor ,which can directly inline with filling machine . 

 
Certifications
 
We have over 10 patented technology in our country.Would love to show to you when you come.



Sample Project
For all our customers, most of them we can have a long term cooperation relationship. Such like for our domestic customers, most of them are introduced by our old customers. For example, in this city, we already have a customer using our machine to produce panels.
The other customers also want to produce, so he can inquire about which machine from which factory. Now in China, we are a very famous brand already.  If not, we can not sell so many machines in domestic markets. As you know in one Country, the information in the same industry is almost transparent. If our machine and service are not good,  our factory can not live from the 2018 year to today.



 

Finished Products







OUR FACTORY


Products

Jinan Oyade CNC Machinery Co., Ltd. is specialized in designing and manufacturing lightweight wall panel production forming machine. With rich experience in mechanical design and manufacturing, professional import and export services, we commitment to provide the best integrated solutions of production line for customers.


Experience
Our general engineer has over 20years experience in mechanical industry, proficient in the newest machinery design/manufacturing. Other main engineers all have over 10years experience .With rich experience in mechanical design and manufacturing, professional import and export services, we commitment to provide the best integrated solutions of production line for customers.
Promise
After installation and commissioning, we will provide technical formula suitable with client's demand, ensuring clients can produce qualified finished products. Additionally, we will help local experienced engineers for one year to master the production process.Our professional sales team, designing team, manufacturing team, installation team, process team, service team, promises you a 100% perfect project.


FAQ
Q: How long is the warranty of your equipment?
A: 1year

Q: Do you supply spare parts?
A: Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year.

Q: Will you provide training?
A: The training is free of charge , and our engineer will be on duty to train your worker.

Q: How will you provide installation&commissioning
A: Will provide 2~8 persons(adjustable according to the degree of automatic )for installation. Engineers team will go with your project.

Q:How long time for the installation and commissioning
A: depend on configuration normally only need 15-25days. Including workers training.
 
Product Tag:
Related categories:
Scroll to Top