Description
China manufacture price forged CW617N brass angle valve1. Nominal Pressure: 0.6Mpa
2. Suitable Medium: Water
3. Working Temperature: 0<T<100deg.
4. Pipe Thread to ISO-228-1: 200
5. Skill : Forging , Polished & chromed plating.
6. Certificated: SGS, CE, ISO9001
7.Size: 1/2"x3/8"
Other size and surface treatments are available too.
ITEM | Designation | Material | Packaging & Delivery |
1 | Handle | Plastic / chromed | Neutral packing: plastic bag,inner box and outer export standard carton |
2 | Body | Brass, CW617N | Or Customized |
3 | Ball | Brass, Hp59-1, chromed plated | Delivery time: within35days after deposit |
4 | Seat/Sealing | PFTE |
5 | O-ring | NBR |
6 | Bonnet | Brass |
7 | Nut | Brass |
Question and Answer
Samples:
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you
Price Terms:
FOB, CNF, CIF.etc.
WE ACCEPT MANY RATE , SUCH AS RMB, US DOLLAY, EUR, KORAD, POUND..ETC
Payment Terms:
1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance, D/P
Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2) We will start to have mass production when confirm our sample and 30% T/T deposit received.
3) Quality is under the control and supervision during the production.
4) Packing information will be confirmed before the production finished, If no special requirment, using our normal package.
Quality control and inspection:
1) Will be check by QC when Material & accessories inspection up arrival
2) In line control on Each Step
3) Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
5) Third Party inspection Such as CE, SABS and so on
6) Original authorization through ISO9001:2009