Description
Medical Waste Incinerator Manufacturer
3D video show installation and operation
Main Features:
1. Fuel: Diesel Oil/ or Gass
2. Treating capacity: 10-500kgs/batch, 3-6times/day
3. Burn-out time: 2 hours (including cooling)
4. Two combustion chamber, fully burning.
5. No black smoke, emission compliance.
6. Highly insulated safe operation.
Widely Application:
1.Infectious medical waste.
2.Animal carcass/ dead body, poultry leather, etc.
3.Daily/domestic garbage/ rubbish.
4. Package waste.
5. Disposalble plastic waste, like bottle, cup, bowl, tray.
6. Other solid waste.
Part Our experience:
8sets Installed in Uzbekistan for World Health Organization support project to UZ 5 citys' hospitals
WFS-30 Waste Incinerator
NO | Item | Spec. |
1 | Burning capacity | 20~30kg/time (3-6 times/day) |
2 | Incinerator size | 1.45m*0.9m*1.75m |
3 | Volume of incinerator | Gas room 0.3m³,Secondary burning room 0.2m³, Mixing combustion room 0.03m3 |
4 | Size of waste inlet hole | 480mm*600mm |
5 | Chimney | Height 5m,Outer diameter 280mm |
6 | Air blower | 0.37kw |
7 | Combustion burner | 0.11kw, fuel consumption 4-6kg/h |
8 | Re-combustion burner | 0.11kw, fuel consumption 6-10kg/h |
9 | Running-voltage | 220V or 380V |
10 | Weight | About 2300kg |
WFS-50 Waste Incinerator
NO | Item | Spec. |
1 | Burning capacity | 30~50kg/time, 3~6 times per day |
2 | Incinerator size | 1.8m*1.15m*3m |
3 | Volume of incinerator | Gas room 0.5m³,Secondary burning room 0.3m³, Mixing combustion room 0.04m3 |
4 | Size of waste inlet hole | 620mm*800mm |
5 | Chimney | Height 10m,Outer diameter 280mm |
6 | Air blower | 0.37kw |
7 | Combustion burner | 0.11kw, fuel consumption 4-10kg/h |
8 | Re-combustion burner | 0.11kw, fuel consumption 4-10kg/h |
9 | Running-voltage | 220V or 380V |
10 | Weight | About 4000kg |
WFS-150 Waste Incinerator
NO | Item | Spec. |
1 | Burning capacity | 100-150kg/time (3-6 times/day) |
2 | Incinerator size | 2m*1.4m*3.5m |
3 | Volume of incinerator | Gas room 1.4m³,Secondary burning room 0.7m³, Mixing combustion room 0.1m3 |
4 | Size of waste inlet hole | 760mm*960mm |
5 | Chimney | Height 10m,Outer diameter 300mm |
6 | Air blower | 0.5kw |
7 | Combustion burner | 0.11kw, fuel consumption 4-10kg/h |
8 | Re-combustion burner | 0.22kw, fuel consumption 7-14kg/h |
9 | Running-voltage | 220V or 380V |
10 | Weight | About 7000kg |
Note: also we can manufacture the other different capacity like 300kg/time, 500kg/time, etc.
Technical configuration:
Model | WFS-30 | WFS-50 | WFS-150 | WFS-300 | WFS-500 |
Burning Capacity | 20-30kg/time (3-6 times/day) | 30-50kg/time (3-6times/day) | 100-150kg/time (3-6times/day) | 200-300kg/time (3-6times/day) | 300-500kg/time(3-6times/day) |
Incinerator Size m (L*H*B) | 1.45*0.9*1.75 | 1.8*1.15*3 | 2*1.4*3.5 | 2.2*1.4*3.8 | 3*2*4.8 |
Imputing Mouth Width (mm) | 480*600 | 620*800 | 760*960 | 900*1100 | 1080*1280 |
Chimney External Diameter (mm) | 280 | 280 | 300 | 400 | 460 |
Draught Fan | 0.37kw | 0.37kw | 0.5kw | 1.1kw | 1.1kw/0.55kw |
Combustion Improver Device | 0.11kw Oil consumption: 4-6kg/h | 0.11kw Oil consumption: 4-10kg/h | 0.11kw Oil consumption: 4-10kg/h | 0.22kw Oil consumption: 7-14kg/h | 0.22kw Oil consumption: 7-14kg/h |
Re-Burning Device | 0.11 kw Oil consumption 4-6 kg/h | 0.11kw Oil consumption: 4-10kg/h | 0.22kw Oil consumption: 7-14kg/h | 0.37kw Oil consumption: 10-20kg/h | 0.37kw Oil consumption: 15-26kg/h |
Voltage | 380v/220v | 380v/220v | 380v/220v | 380v/220v | 380v/220v |
Company Information:
Shandong Better Enviromental Protection Technology Co., Ltd, is the largest enviromental protection machinery manufacture in Shandong province,with over 10 years experience and hard work of our emplyees,
we won the National Patents for our machines and customers all over the world. Better Group is the biggest environmental protection water and waste treatment machinery company in Shandong Province,
it's a high-tech enterprise, which adopted the US technology, and with experience over 10 years.
During the past decade,we won very good reputation among our customers all over the world,Turkey, Janpan, Australia, Maldives, Argentina, Saudi Arabia, Bangladesh, Iran, etc, and becoming a listed company on 9th Dec., 2014.
You can provide us the water sources, water quality, flow rate and ground area, material requirements about your project, then more technical solutions will be suggested to you.
Why choose us
1. We consistent good quality with reasonable price.
2. Big company, good reputation, more reliable.
3. Delivery in time.
4. Over 15 years' experience since 1991.
5.Considerable after-sales service.
FAQ
1.Q:Are you a factory or trading company
A: We are a factory, we have rich experience for manufacuring water processing equipment for more than 10 years.
2.Q:Where is your factory located? How can i visit there?
A: Our factory is located in No.3388 Zhencheng Road, Huangtu Town, Jiangyin City, Jiangsu Province,China. It is about 2 hours from Shanghai airport. We can pick you up if you need, welcome to visit our factory.
3.Q: Do you have minimum order quantity request?
A: No minimum order, but it can get a discount if you order a large quantity.
4.Q: Do you have certificates?
A: Yes, we have ISO,SGS certificate.
5.Q: Can you meet my special requirements for my products?
A: Yes, we have a professional design team. We can provide drawings according to your requirements.
6. Q:How to buy your idea products?
A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
7. Q:How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
8. Q:What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
9. Q: How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
10. Q: How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
11. Q: How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
12. Q:How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.