Yt-500A Regular Concrete Strain Gauge for Mining Machinery

Min.Order: 10
Product origin: Zhenjiang, Jiangsu, China
Infringement complaint: complaintComplaint
US$ -1

Description
  • Introduction
  • YT-500A regular concrete strain gauge has alloy elastomer structure, it has all stainless-steel shell, with high pressure resistance, high radial resistance and zero stability. It is suitable for long-term embedding in the interior of concrete structures such as beams, columns, pile foundations, supports, retaining walls, hydraulic structures, linings and its bedrock, to monitor its stress and strain. The temperature can be measured with a thermistor.
     
  • Main Specifications
  •  
  • Specification  10, 15, 20
    Standard Range  100mm, 150mm, 200mm
    Measuring Range  Pull:1200 uε    Press:1800 uε
    Resolution ≤0.02%F•S
    Accuracy ≤0.5%F•S
    Working Temp -25ºC~+60ºC (Need to install temperature sensor)
    Temp. Measure Range -40 °C~+80°C (Need to install temperature sensor)
    Temp. Measure Accuracy ±0.5ºC
     

 Packaging & Delivery
1.Packaging Details:1. Wooden box
2. Carton
3. As your request. 
2.Delivery Detail:Shipped in 30 days after payment
3.Logo:Any logo is available
4.MOQ:100 pcs
5.Samples: Free
6.OEM Accepted Yes
7.Production Capacity:10,000pcs Per week
8.Payment Term:(1) L/C,T/T,D/P,D/A,PAYPAL,WESTERN UNION,MONEY GRAM
 
  •  
OUR FACTORY













FAQ:

Q1.Can I get free samples?

A: Yes,we can provide you the free sample, but you need to bear their own delivery costs.
 
Q2. Can I have a sample order for fittings?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

Q3. Are you a trading company or a manufacturer?
 A: We are a manufacturer.

Q4. What is your payment term?
 A:Normally T/T 50% in advance, balance to be paid before delivery.

 Q5: What is your main market?
 A:North America,Greenland,South America,Africa,Southeast Asia, Former Soviet Republics ,East Asia,and Europe.

 Q6:What kind of trade terms can you do?
A:EX-WORKS,FOB,CFR,CIF,etc.

Q7. What about the lead time?
A:Sample needs 15 days, mass production time needs 35 days.
 




Product Tag:
Related categories:
Scroll to Top