Die Casting Mechanical Custom Sheet Metal Fabrication Products

Min.Order: 500
Product origin: Weifang, Shandong, China
Infringement complaint: complaintComplaint
US$ 0.2 ~ 3

Description

                                 Die Casting Mechanical Custom Sheet Metal Fabrication Products

 
A. Raw MaterialCopper ,BeCu, phosphor copper, Brass, Stainless steel, Aluminum, SGCC, SECC, steel, spring steel, Nickel-Silver... and all different kinds of metal;
B. SPEC Roll material thickness is 0.05-10mm;sheet metal  thickness is 0.3-20mm;
C. Surface treatmentGold / Silver /Tin / Nickel / Zinc /  Chromium / Copper-plating /  Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis /  Passivating /Deburring /  Polishing /  Brush according to ROHS standard;
D. ApplicationAll different kinds of telecom products, loom, furniture, and so on ;
E. QuotationPlease provide the Formal drawings (normally, with DWG/STP/PDF file ),and make note with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet in 48-72 hours;
F. Prototype & MouldWe make the prototypes or moulds according to the drawings that confirmed by both of us and customers! The lead time is depends on the structure and qty of parts, Normally, lead time for prototypes is 3-15 days; lead time for mould is 10-25 days;
G. ProductionWe will provide samples according to the drawings to customers for approval. Then arrange the production  and confirm the delivery date according to the Purchase Order; Normally , the lead time for production is 5-30 days ,the structure of parts is different , the lead time will be different .
H. PackagePlastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.

       Advantages:
       1. We are ODM&OEM, design according to your drawing.
       2. Rich experience and good technology support.
       3. Manufacturer and Trade Company.
       4. Low MOQ is accepted.
       5. 100% inspection before delivery.
       6. Competitive price with high quality.

 
          OUR PRODUCING PROCESS:
          1. Tooling (Mold) design and Manufacture.
          2. Manufacture the parts according to the Stamping Machine.
          3. Riveting, Welding or Screw tap according to Customer's require.
          4. After finish manufacture process we will test the parts by the Image measurement instrument, 
          Caliper, Angel Gage etc.
          5. After make sure all the dimension can reach customer's require, we will make the surface 
          treatment process.
          6. After finish surface treatment we will testing all the parts by worker so that we can make sure 
          the parts which we sell is 100% qualified.
        7. After finish testing we will pack the parts by Vacuum Package Machine.


FAQ:
Q: Are you trading company or manufacturer?
A: We are Factory, Mainly processing customized sheet metal products.

Q: How soon can I get your response?
A: our company rules that we must reply customers within 24 hours. Our current average response time is 4.3 hours.
stainless steel roll fabrication
Q: How soon can I get your quotation?
A: We are trying to quote you within 24 hours, however, it depends on drawings quantity and complicating rate. If you are really very urgent, call us or email us so that we will put it in priority.
rolling a sheet metal cone metal fabrication fabricated metal
Q: How can I get a sample for quality check?
A: After quotation, if needed, you can ask for samples to check quality. We will provide you free samples(value under 20 without tooling invest) as long as you pay freight cost by yourself.
steel fabricator fabrication stainless steel sheet metal fabrication
Q: What's your leading time for mass production?cone sheet metal sheet metal fabrication
A: Laser cutting service, normally 1-3 days are needed.
Custom metal parts,normally 2-7 days are needed.
Equipment&Instrument Shell, normally 7-30 days are needed.
Integral Machine machining, normally 20-50 days are needed.
Of course, order quantity is an very important element for leading time.
sheet metal fabricating steel fabrication metall cone
Q: What is your terms of payment ?
A: Payment≤1000USD, 100% in advance. Payment≥1000USD, 30% T/T in advance, balance before shippment.

Q: Can you design drawings for us?
A: Yes, we have a professional engineer design team.
metal cone sheet metal cones stainless steel fabricators
Q: Will my drawing be safe after you get it?
A: Yes, we can sign a non-disclosure agreement.


   If you are interested in product,please click " SEND " for more details.
Product Tag:
Related categories:
Scroll to Top