China Produced Hydraulic Sideboom Pipe Pipelayer Lifting Crane

Min.Order: 1
Product origin: Shanghai, China
Infringement complaint: complaintComplaint
US$ 50000 ~ 80000

Description
                        China produced Hydraulic Sideboom Pipe Pipelayer lifting crane
 

Lifting Pipelayer Machine / Crane for Oil and gas pipeline

multifunction pipelayer adopts the excavator as chassis, its boom is telescopic, it is with

pipe clamping device, its balance weight can move right & left and up & down and it has the

following functions: pipe hoisting, pipe clamping, pipe transporting, pipe laying and excavating.

Tractor-description

ItemUnitDGY12DGY24
 Max.rated lifting loadt1224
 Max.working radiusm33
 Engine outputKw125198
 Max.speedKm/h5.2/3.55.2/3.5
 Fully extented boom lengthm11.712.2
 Max.lifting heightm11.811.8
 Most suitable pipe ODm1.0161.016
 Max.pipe lengthm1212





1.. Which countries do we export to?
Asia: Vietnam, India, Indonesia, Pakistan, Kazakhstan, Uzbekistan, etc.
Europe: Russia, Belarus, Ukraine, Lithuania, Saudi Arabia, etc.
South America: Brazil, Chile, Paraguay, Argentina, etc.
Africa: South Africa, Ethiopia, Libya, Ghana,Algeria,etc.

2.What are our advantages compared with other manufacturers/factories?
1)Reliable Quality: Carefully select regular manufacturers for supporting
spare parts,like engines,bridge,transmissions,and many parts designed
and produced by ourselves,

always adapting the best materials.
2)Competitive Price: Concentration of mechanized production in large quantities reduce
production cost to ensure that our price is competitive.
3)Service Team: First, our sales managers are online 24 hours,ready to answer your
questions at any time. Second, professional maintenance team with senior technicians, 
ready to provide support services to users and dealers. Most problems can be solved 
within 24 hours.
4)Fast Delivery:Under normal circumstances,we can delivery with 10 working days in
factory after receiving pre-payment.
3.Which payment terms can we accept?
Normally we can work on T/T or L/C.
1)On T/T term, 30% payment is required in advance for production, 70% balance shall 
be paid before delivery or against the copy of original B/L for old long cooperation clients.
2)On L/C term, 100% irrevocable L/C at sight without "soft clauses" can be accepted. 
4. How long is the validity of our quotation?
As a reliable supplier, basically our price remains stable through one year, we only adjust
our price based on two situations:
1)The rate of USD
2)TheThe price of material

Other questions, please contact me directly!!

Peter +8615921244786

 

 
Product Tag:
Related categories:
Scroll to Top