Zcj02 Insulating Glass Argon Testing Machine

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 1300

Description
ZCJ02  Insulating glass Argon testing machine
  1. ZCJ02 machine is a special equipment for gas charging in insulating glass.
  2. adopting the microcomputer and high quality components,the equipment are automatically,stable and reliable,applicable aluminum spacer type insulating glass and rubber strip type insulating glass.
  3. with compact size and four universal wheels on base,it is flexible and convenient in use.
  4. it can charge 4 sheets of glass at the same time,as in dispensible equipment for improving the performance indexes of insulating glass.
 
total power0.1KW
voltage220v/50hz
weight60KG
dimension620mm*439*mm*700mm





 

RFQ

1.Question:Are you manufacture?

Answer:

Yes,we are the professional manufacture which have more than 5 workshops.

2.Question: How about the service ?
Answer:
1).reply it at once if from Ali-trademanager,if by email,it reply it within 12 hour
2).deliver max. days within 15 days
3).24 hours for after -sale serive
4).more than 12 years experience in this kind machine field
5).fluent english ,communication barrier free

3.Question:What's the guarantee ?
Answer:
1).Our guarantee for 18 months.
2).24 hour's technical support by email or calling
3).English manual and video tutorial
4).2 year quality guaranty for the machine (excluding the consumables)
5).We will provide the consumable parts at an agency price
6).24 hours on line service each day, free technical support.

4. Q: Do you provide equipment operation training?

Answer:
A: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training. All of our engineers have passport.

5.Question:if our price is higher than another company or factories ?
Answer:
please check, what is is the different of the machine parts ,service and guarantee,especially the machine inner electric parts, sometimes, if machines have breakdown, the most reason is the machine inner electric parts problem, but we use the famous and reliable parts for the machines inside.

6.Question:How long is the delivery time ?
Answer:
For standard machines, it would be 3-15 days; For non-standard machines and customized machines according to clients specific requirements, it would be 15 to 30 days.

7.Question: What is the payment ?
Answer:
Any payment method you want,such as L/C,T/T,D/P,West-union and so on

Product Tag:
Related categories:
Scroll to Top