Heavy Steel Structure Frame Prefab Warehouse Workshop Building

Min.Order: 1
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 30 ~ 40

Description
workshop in Algeria

exhibition room in Aruba
Name of building:Showroom in Aruba
Structure System:Frame Structure 
Construction Area:1585sqm
Project Status:1.Steel Frame had already been finished fabrication.
 2.Glass curtain wall and EPS cement wall panel are finished.
  Roof claddings,electricity,plumbing,elevator and decorations will be continued.

Product Application


steel structure building is a new type of building structure system, which is formed by the main steel framework linking up H-section, C-section, and U-section steel components, roof and walls using a variety of panels and other components such as windows and doors. Light steel structure building is widely used in warehouses, workshops, large factories and so on.

Main Features


1. We purchase raw material directly from big mills in order to reduce the cost. 
2. All the material for steel structure workshop are H beam, C purlin, Z purlin, corrugated color steel sheet and sandwich panels. 
3. Wall panels and proof panels can be corrugated sandwich panels or color corrugated steel sheet. 
4. The steel structure has the advantages of quake-proof, pollution-free, energy-saving and security in construction. 
5. It's characterised by light weight, easy installation, short construction period, quick investment return and eco-friendly. 
6. We have our own Quality Control Department to guarantee the quality for projects. 
packagepallet
materialsteel 




Packaging Details
we will use steel pallet for packing or pack it according to customers special request.





 FAQ:
1.What's the common type of the industrial building?
Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients' request.
2.What are the payment terms?
TT and L/C are acceptable and TT will be more appreciated. 30%deposit before producing, 70% balance before loading by TT.
3.What is the delivery time?
It depends on order quantities and how complicated it is Generally speaking, the delivery time will be within 30 to 50days after deposit.
4.How to pack the products?
We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5.How to install after the goods arriving destination?
We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

 
Product Tag:
Related categories:
Scroll to Top