Waste Tyre Recycling Machines/Rubber Powder Making Line/Reclaimed Rubber Production Machine

Min.Order: 1
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 100000 ~ 200000

Description
Customized waste tyre recycling plant design. Turn scrap tyres into reclaimed rubber.

Reclaimed rubber making process:
1. Tire splitting machine/tire cutting machine: Cut waste tyres into two pieces.
2. Stripe & lump cutting machine: Cut tyres into stripes and then lump.
3. Cracker mill & aulixiary equipment: Crushing rubber lump into rubber powder.
4. Auto clave tank: De-vulcanizing rubber powder.
5. Refining mill machine: Make reclaimed rubber sheet.

Full set of rubber powder and reclaimed rubber production line is available. We provide turnkey plant solution!


Specifications:
ItemSpecification
Waste tyre diameter900~1200mm
Cracker mill modelXKP-610
Production capacity1000~1200kg/h

Machine list:
ItemQTY
Tyre splitting machine1
Stripe cutting machine1
Lump cutting machine1
Cracker mill1
Main vibrating screen1
Vice vibrating screen1
5 roll magnetic separator1
Screw feeder1
Conveyor belt machine2
Screw lifting machine1
2 roll magnetic separator1
Beas grinder1
Powder collector1
Autoclave1
Refining mill6
Conveyor machine1
Auto batching machine1
Dust removal system1













 

Company Profile

 

Qingdao MaoYuanFeng Machinery is a dedicated company to provide high quality rubber machinery to worldwide customers.

Our solutions:
Tire plant solution
Tube plant solution
Conveyor belt plant solution
Rubber mat plant solution
Waste tire recycling plant solution
Reclaimed rubber plant solution
Rubber product plant solution
We are manufacturer and dealer of various kind of rubber machines including rubber processing machines, rubber product making machines.

Our products:
Tire making machines:

Rubber anbury mixer, internal mixer, dispersion kneader, two roll mill, TSR, batch off machine, extruder, calender, building machine, curing press machine.

Conveyor belt making machines:
Vulcanizing press.

Rubber mat making machines
Inner tube making machines

 

After Sales Service

Global headquarter: Qingdao, China
Branches: Thailand, Sri Lanka.

Service
Plant engineering                    - We provide FREE layout design for new plant.
Supplier Integrity                    - 24/7 working machines, extremely reliable.
Plant Installation Support      - Installation&commissioning service.
Spare Parts                              - Long lasting parts are manufactured by us, always available.
Maintenance/Optimization     - Overseas engineers available.
Training                                    - We provide FREE training for new plant.
Raw Materials                          - Raw material support exported from China.

You May Like

 

 

FAQ

 

1.      Q: How to guarantee the quality of outsourcing parts?
          AFirst choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.      QWhich brand of electric part?
          A: Use world famous brands, Siemens, Omron, Toshiba, ABB
Customer can specify the brand.
3.      QWhich PLC:
          ASiemens, Omron, Mitsubishi
4.      Q: How to control the quality?
           AThere are inspectors for inspecting equipment quality and performance, after a ssembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.       QWhen the guide engineer arrive at customer's factory?
           A:  If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.       QWhat is the warranty time?
           A:  2 years after machine arrived at factory
2.       QHow to solve the problem?
           AWithin one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.

Foreign Customers Visit Factory:

Will Gao
Sales manager
Qingdao Maoyuanfeng Industry & Trade Co.,Ltd
A:Shijidadao Road, Huangdao District, Qingdao, Shandong, China


Product Tag:
Related categories:
Scroll to Top