Energy Effective Column Type High quality/High cost performance PCR Tire Hydraulic Bom Vulcanizing Press

Min.Order: 1
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 100000 ~ 150000

Description
GRAND SALE! 30% OFF!
BEST CHANCE FOR TIRE PLANTS!


48" PCR tire curing press for sale. Total 4units in stock.

Brand new.
Fast delivery.
Global warranty.
Best service.
Thailand, Sri Lanka free technical support.

PCR tire TBM 20units in stock also available.
Contact for more detail.

 
NoNameTechnology Parameter
1Quantity12 units/group
2Cavity quantity2 or 4
3Tire size10''-21''
4Tire section2.50''-6.00''
5Max. mold close force120T / mold
6Press Oil cylinderModelPiston
Press Oil Cylinder300x50, 2 pieces
speed6mm/s
7Lifting Oil CylinderSize63/45x1450
Speed110mm/s
8Heating plate ODΦ900mm
9Mold height110-220mm
10Green tire heightMax. 450mm
11Heating plates space900mm
12Center mechanismTr130*4teeth/inch(Tr95*4
teeth/inch)
13Mold close speed100mm/s
14Shaping steam PressureNot more than 0.3Mpa
15Low press steam pressure0.8Mpa
16High press steam pressure1.4Mpa
17Media inside bladderSteam/nitrogen
18Curing tire quantity2 pcs/unit per time. 30 min /pcs,32 pcs/shift
19Air pressure0.8Mpa
20Pump motor power37KW, 1440rap
21Control voltageDC24V











 

Company Profile

 

Qingdao MaoYuanFeng Machinery is a dedicated company to provide high quality rubber machinery to worldwide customers.

Our solutions:
Tire plant solution
Tube plant solution
Conveyor belt plant solution
Rubber mat plant solution
Waste tire recycling plant solution
Reclaimed rubber plant solution
Rubber product plant solution
We are manufacturer and dealer of various kind of rubber machines including rubber processing machines, rubber product making machines.

Our products:
Tire making machines:

Rubber anbury mixer, internal mixer, dispersion kneader, two roll mill, TSR, batch off machine, extruder, calender, building machine, curing press machine.

Conveyor belt making machines:
Vulcanizing press.

Rubber mat making machines
Inner tube making machines

 

After Sales Service

Global headquarter: Qingdao, China
Branches: Thailand, Sri Lanka.

Service
Plant engineering                    - We provide FREE layout design for new plant.
Supplier Integrity                    - 24/7 working machines, extremely reliable.
Plant Installation Support      - Installation&commissioning service.
Spare Parts                              - Long lasting parts are manufactured by us, always available.
Maintenance/Optimization     - Overseas engineers available.
Training                                    - We provide FREE training for new plant.
Raw Materials                          - Raw material support exported from China.

You May Like

 

 

FAQ

 

1.      Q: How to guarantee the quality of outsourcing parts?
          AFirst choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.      QWhich brand of electric part?
          A: Use world famous brands, Siemens, Omron, Toshiba, ABB
Customer can specify the brand.
3.      QWhich PLC:
          ASiemens, Omron, Mitsubishi
4.      Q: How to control the quality?
           AThere are inspectors for inspecting equipment quality and performance, after a ssembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.       QWhen the guide engineer arrive at customer's factory?
           A:  If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.       QWhat is the warranty time?
           A:  2 years after machine arrived at factory
2.       QHow to solve the problem?
           AWithin one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.

Foreign Customers Visit Factory:

Will Gao
Sales manager
Qingdao Maoyuanfeng Industry & Trade Co.,Ltd
A:Shijidadao Road, Huangdao District, Qingdao, Shandong, China


Product Tag:
Related categories:
Scroll to Top