New Brand Shoe Injection Molding Machine EVA Slipper Shoe Sole Making Machine with CE

Min.Order: 1
Product origin: Quanzhou, Fujian, China
Infringement complaint: complaintComplaint
US$ 126000

Description
ItemunitParameter
Work Stationsstation8
Clamping  Forceton180
Mold Heightmm100-230
Mould-Opening Strokemm350
Mould Plate Sizemm(290*550)*2
Injection System  
Injectorset2
Diameter of ScrewmmФ65
Injection Cap(MAX)cm3920
Injection Pressurekg/cm20-130
Injection Speed cm/sec0-10
Rotating Speed of Screw r.p.m0-190
Temperature Control station4
Electricity Consumption  
Heater Barrelkw9.8*2
Heating Platekw102.4
Hydraulic Systemkw51.9
Vacuum Pumphp1.5
Cooling Fan of Barrelhp1
Total Electricitykw155.8
Oil Tank SizeL1000
Machine Weightkg33000
Data are not binding and may be changed without prior notice.
1.Its product range includes EVA slippers, sandals, clogs, mid-sole, sport protectors and various kinds of shoes and shoe accessories all depends on the EVA shoe mould and can also make EVA wheel for toys and so on.
2.The clamping force can be increased from 150 to 210 tons, according to your requirement.
3.The foam EVA injection molding machine is fully hydraulic and automatic operation except taking out product. 
4.It is PLC controlled, its humanized parameter computer operation interface provide quick and exact terms of production.
 
Character:
1.Low operation height,Operation height in accord with human engineering.
2.Extra height opening stroke
Act by fixed opening stroke: 350mm, which is not affected by any mould thickness changes and 
3.available for 2plates mould,Mould thickness adjusting mechanism
Mould adjusting scope: 100-200MM
4.Rapid mould opening ,Act by toggle mechanism which opens the mould rapidly
5.Speedy injector movement .
Driven by linear-track, allowing speedy moving and precise positioning,Energy saving design
6.No need water circulation for mould station
7.Space saving design,Put oil tank together with injection base, which makes the structure compact and saves more space.
 
FAQ.
 
Delivery date:
Within 20 days After receiving the 30% earnest money
 
Payment term: 
Advance payment at order 30%, 70% before shipment
 
Delivery State: 
Machines were taken apart and packed in suitable package that fits container shipping
 
For the machine experiment and installation, our technician will be sent to your 
factory. And you are requested to afford the cost of their trip and payment .
Our technician will manage all the machine things for you and at the same time   train  your  workers on 
how  to use  and maintain the machine.
 
Guarantee Time: 
One-year warranty and lifelong service.  During guarantee period, the cost of any spare parts or new accessory should be borne by the seller, and the freight for delivery of spare parts will be on the buyer's account.

 
Product Tag:
Related categories:
Scroll to Top