Really Cheap Light Steel Frame Camping Tent

Min.Order: 500
Product origin: Binzhou, Shandong, China
Infringement complaint: complaintComplaint
US$ 50 ~ 60

Description
Steel Building Benefits 
Using a combination of metal construction and pre-fabricated components provides three main advantages: 

Cost. 
Because erection labor is drastically reduced, you can save as much as 30% or more over more traditional construction methods.

Speed.
Because many of the components are pre-fabricated at our plant, construction time is greatly reduced.

Durability.
Steel building components are guaranteed to last 20 to 30 years without repainting or other maintenance. 



1.Steel Structure Information: 
Typeconstruction building
Wide spansingle span or multiple spans, the max span clear distance is 36m, without middle column
Roof and Walloption: Steel sheet,EPS, fiber glass, rock wool or PU sandwich panel
Door and WindowPVC or Aluminum alloy; sliding door or rolled door
Column and BeamOption: hot rolled or welded H section, I section; painting or galvanized
PurlinOption: C-section or Z-section
Local Climate1. Wind speed
2. Snow load 
3. Rain quantity
4. Earthquake grade if have
More details is preferred.
Crane Parameter If need crane beam, crane tons parameter and lift height are needed
Drawing 1. according to clients' drawing
 2. design as per clients' dimension and requests
PackageNaked loaded in shipping container or as per requests.
Loading 20 GP,  40HP, 40 GP,  40 OT
 
2.Our Technical Advantages:
A. We have our own technical teams, so we can designfabricate and install this steel structure workshop according to customers requirement.
B. It's very easy to install the steel structure workshop in your there according to our installation drawings. Also, we will supply all technical support during installation and after-sale service.
C. One stop shopping---we offer not only steel structure but also sandwich panels and all the accessories. It will ensure the perfect integration between each part.
D. fast construction, easy installation, stable structure, earthquake proofing, energy conserving and environment protection.

E.We have pretty good preservative treatment on this steel frame as follows,

  1. Clean the steel( reach to Sa2.5 Grade, China Code), then we will spray paint: 2 layer epoxy zinc rich primer and 2 layer 

   antirust paint( total thickness: 100-120um); Warranty period: 18-20 years under normal conditions.

 

  2. Hot-dipped galvanized, when the thickness of parts is less than 5mm,thickness of hot-dipped gal is more than 65um;

    when equal to or more than 5mm, that is more than 86um. Warranty period: 45-50 years under normal conditions.



3.Oversea Projects:






4.Company View:



Warmly welcome to visit our company!

Company NameShandong Wiskind Steel Building Tech Co.,Ltd
Telephone0086-15725500355
Websitewiskindprefab.en.made-in-china.com

 

Product Tag:
Related categories:
Scroll to Top