2020 Least Pharmaceutical Waste/ Laboratory Waste/Medical Waste Special Incinerator Hospital Equipment

Min.Order: 1
Product origin: Weifang, Shandong, China
Infringement complaint: complaintComplaint
US$ 6999 ~ 7999

Description
Pharmaceutical Waste/ Laboratory Waste/Medical Waste Special Incinerator Hospital Equipment

WFS series waste incinerator is based on Japanese technology, absorbing similar equipment at home and abroad, adopting the most advanced combustion mode of primary pyrolysis gasification + mixed combustion with surrounding air + secondary incineration + burnout treatment, with the maximum temperature of 1600 ºC, which can effectively burn virus and harmful substances.








Used for
Medical Wastes treatment: hospital wastes such as:
bandage , swaps,needles, injection syringe, drop bottle, lab waste, expired drugs, infectious internal organ, napkin, diaper, mask, gloves, straps, gauze, blood vessels, organs,pharmaceutical waste, hazardous wastes , Laboratories wastes, healthcare waste. 





Technical support

(1) 3D video guide                         
(2) Manual book in English
(3) Technical drawing
(4) Experienced engineers guidance and technical support


Advantages

(1)long life
(2)Totally enclosed operation
(3)Applicable to the treatment of various solid wastes
(4)No smoke, no residue
(5)Simple operation
(6)Small floor area
(7)Reasonable combustion technology
(8)Good combustion effect


Main Features

(2) Both gas-motivated and oil-motivated are all can be preferred according to customers' needs.
(4) Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust, dioxin etc. (lower than International standard).


Packaging  delivery










Company Profile






FAQ

Q:How to buy your incinerator ?
A:You can provide the type and amount of garbage (please contact us for details). We will design the incinerator for you for free.


Q:How to pay ?
A:TT and L/C are acceptable TT will be more appreciated.


Q:What is the delivery time ?
A:It depends on order quantities .Generally speaking,the delivery time will be within 1 to 2 weeks.


Q:How to install after the equipment arriving destination ?
A:We will provide detailed illustrations to you.And we will send a technician to guide for installation and debugging.After debugging equipment ,he will teach your workers how to maintain it.

Q: How to keep your equipments from corrosion?
A: We use the world-famous paint, like epoxy-coal tar pitch etc. What's more, we paint strictly according to the standard process.

Q: How about the warranty?
A: If there is any malfunction of the equipment during the warranty period, our company promises to propose a solution within 24 hours. If it is caused by non-human causes, our company provides repairs free of charge and guarantees that the equipment is running well again.
Product Tag:
Related categories:
Scroll to Top