Jmj Series Cellulose Fiber Shear Grinding Mill with Ce Certificate

Min.Order: 1
Product origin: Shaoxing, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 5000

Description
Jmj Series Cellulose Fiber Shear Grinding Mill with Ce Certificate
 
Working Principle

Material through Belt conveying machine sent to (in belt sent material of while for metal detection, prevent material in the entrainment metal debris) plus hopper Hou quickly is high-speed air with into dynamic knife ,high-speed rotating of rotor led dynamic knife by produced of powerful ,and full dispersed reached Super fine cut crushed of effect, qualified material through sieve network discharge area,unqualified material will be grinded ; To reach the required fineness of the materials and production, you can replace the screen, adjust the cutter clearance or different numbers of knives.



Technical Parameter

Flow Chart ( JMJ-500)
 
 

Related Engineering Cases


Technical support
Upon receiving the deposit, we will offer the following technical services:
1. Design for your production line flow and equipment layout, free of charge;
2. Provide foundation drawings of customer-ordered grinding mills and drawings of related parts, etc;
3. Technical parameters of peripheral equipment will be supplied;
4. Free technical suggestions on adjusting of equipment layout and application.
5. Equipment upgrading (customers need to pay the cost);


Quality assurance
1. Strictly conforming to ISO9001-2000 quality management system;
2. Strict control from purchasing inspection, process inspection to final proofing;
3. Established several QC departments to execute quality control regulations;
4. Detailed quality control examples:
(1) Complete files for quality control and quality feedback;
(2) Strict inspection for the components of our grinding mills, to assure products free of damage and avoid rust-eaten and paint peeling off later on.
(3) Only qualified components will be assembled and total equipment must be inspected completely before sale.


After sale service
1. We will send our technician to the site for guiding equipment installation and commissioning.
2. During the installation and commissioning, we offer operator training service.
3. The quality assurance date is one year after commissioning. And after that, we will collect the cost if provide repairing for your equipment.
4. Maintenance for equipment failure caused by improper handling (appropriate cost will be collected).
5. We offer the components with favorable price and perdurable maintenance.
6. If equipment repairing is needed after quality assurance date is expired, we will collect maintenance cost.

Product Tag:
Related categories:
Scroll to Top