Custom Made Aluminum/Aluminium/Stainless Steel/Brass Panel Parts Stamping Bending Parts Bending Fabrication

Min.Order: 200
Product origin: Weifang, Shandong, China
Infringement complaint: complaintComplaint
US$ 0.1 ~ 3

Description
Product Description

Custom Made Aluminum/Aluminium/Stainless Steel/Brass Panel Parts Stamping Bending Parts Bending Fabrication


OUR PRODUCING PROCESS:
1. Tooling (Mold) design and Manufacture.
2. Manufacture the parts according to the Stamping Machine.
3. Riveting, Welding or Screw tap according to Customer's require.
4. After finish manufacture process we will test the parts by the Image measurement instrument, Caliper, 
Angel Gage etc.
5. After make sure all the dimension can reach customer's require, we will make the surface treatment 
process.
6. After finish surface treatment we will testing all the parts by worker so that we can make sure the 
parts which we sell is 100% qualified.
7. After finish testing we will pack the parts by Vacuum Package Machine.

 
A. Raw MaterialCopper ,BeCu, phosphor copper, Brass, Stainless steel, Aluminum, SGCC, SECC, steel, spring steel, Nickel-Silver... and all different kinds of metal;
B. SPEC Roll material thickness is 0.05-10mm;sheet metal  thickness is 0.3-20mm;
C. Surface treatmentGold / Silver /Tin / Nickel / Zinc /  Chromium / Copper-plating /  Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis /  Passivating /Deburring /  Polishing /  Brush according to ROHS standard;
D. ApplicationAll different kinds of telecom products, loom, furniture, and so on ;
E. QuotationPlease provide the Formal drawings (normally, with DWG/STP/PDF file ),and make note with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet in 48-72 hours;
F. Prototype & MouldWe make the prototypes or moulds according to the drawings that confirmed by both of us and customers! The lead time is depends on the structure and qty of parts, Normally, lead time for prototypes is 3-15 days; lead time for mould is 10-25 days;
G. ProductionWe will provide samples according to the drawings to customers for approval. Then arrange the production  and confirm the delivery date according to the Purchase Order; Normally , the lead time for production is 5-30 days ,the structure of parts is different , the lead time will be different .
H. PackagePlastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.

       Advantages:
       1. We are ODM&OEM, design according to your drawing.
       2. Rich experience and good technology support.
       3. Manufacturer and Trade Company.
       4. Low MOQ is accepted.
       5. 100% inspection before delivery.
       6. Competitive price with high quality.
       7. Convenient transportation. 

       
      Our promise:
       1.Offering design and improvement scheme freely.
       2.Offering video and photos with details freely during production.
       3.Helping customers to do factory inspection freely for his other Chinese suppliers.
       4.We have our own factory, and 80% of our employees have been working for more than 10 years. 
       5.Producing completely according to the accuracy of drawings,assembly measurement to detect
       function and strict quality control to ensure 0 return rate.

       6.99% orders can be ensured delivery time.
       7.Quote can be offered within 24 hours fastest.
       8.Delivery time is only 7 days fastest.
       9.Responding to the enquiry within 2 hours.
      10.The materials we use are optimal.
      11.24 hours online service.
      12.The lowest price with the same quality and service.
      13.Logistics arrangement with high performance to price ratio.
      14.The most suitable packing method to different products.




 

     If you are interested in product , please click " SEND " for more details.
Product Tag:
Related categories:
Scroll to Top