Simple living For prefab steel structure home, most people will be relatively unfamiliar, but in modern buildings, they are widely used due to their unique advantages. The prefab steel structure home are also divided into different types, the more commonly used is the prefabricated steel house. The wall and roof materials of this kind of mobile house are made of colored steel plate cladding polystyrene foam sandwich composite board. The color steel sandwich panel has the characteristics of heat preservation and heat insulation, anti-corrosion and souFire Retardant Prefab Steel Structure Home Accommodation is earthquake resistance, heat preservation, fire prevention and heat insulation. Each household is about 20 square meters, equipped with liquefied gas, supply, and supply facilities, which can basically meet the living needs of the victims. In addition, according to the proportion of the number of households of residents, the construction of schools, garbage houses, toilets and other related supporting facilities. Fire Retardant Prefab Steel Structure Home can be used for one to two years, which can solve the housing problem of the victims during the transition period and solve the urgent need.
1.Measure the size (inner width 5.46m), put the ground beam by expansion screw. 2.Install the column and floor beam. 3.Install the outside wall panel of the first floor, and Mgo plate and stairs of the second floor. 4.Install the purlin and surrounding beam. 5.Install the doors, windows, and roof panel.
1.Easily assemble and disassemble. 2.Conveniently Transport. 3.Simple terrain requirments, can be located in hillsides, hills, grasslands, deserts, riversides. 4.The K-Type prefab house is durable and stable, and also with good thermal insulation performance. 5.Its design can be customized, with exquisite and elegant appearance. 6.Most components of prefab house are completed in the factory, the site assembly is convenient and fast.
Henan K-home Steel Structure Co.,Ltd is located in Xinxiang, Henan Province. It is a self operating private enterprise, established in the year of 2007,registered capital RMB 20 million, cover an area of 100,000.00 square meters with 260 employees. We are engaged in design, project budget, fabrication, installation of steel structure and sandwich panels with second-grade general contracting qualification. Our main products covered sandwich panels, OEM prefab house, container house, construction material, light steel structure house, light steel villa, non-standard design house, steel structure projects, and installation service.
We can offer you three type of insisting on the installation: 1.1 : We can offer you the manual include the photos and drawings, or some videos for help you on the installation. And you will organize the local people to install it. 93% of our clients finished their houses in this way. 1.2: We can send our people to your site to guide your people to install. Or send team people (3-5 people) to your site to install for you. This way is most easy way, but you need to pay their round-way tickets, local food, accommodation, transportation, communication and salary, and also their security on the site. Almost 5% of our clients choose this way. And in the normal we will require the order should be more than 100000USD. 1.3: You can send your people (engineers or the technician) to our company to study the installation details. 2% of our clients choose this way for their orders. 2. The advantage of the prefab house. 2.1 : Recycle using: you can assemble it in the site A, then disassemble and install again in the site B, then site C. In such way, there is no industrial rubbish after you finish the jobs in the site. 2.2 : Low cost. The steel structure is much lower on the cost then the tradition building. 2.3 : Quickly installation. In the normal, 6 skilled persons team can install 150 sq.m house every day. 2.4: safety: the prefab house can resistance 7 grade earthquake, and 100km/H wind. 3. The mainly use of the prefab house: In the normal it's mainly used as temporary building in the site, such as temporary office, labor accommodation, etc. And in the recent years, the prefab house is largely use in the resettlement housing in some disaster area. In 2008, it played a major role on the resettling the victims after the terrible earthquake on 12th, May, 2008. 4. How to maintain your prefab house? 4.1: First of all, when the prefab house is installed, it's better not to make any other changes, like an expansion, adding partitions or cutting down the walls, or removing screws, and so on. 4.2 : Made the re-paint every 1-2 years after you install it. Such way can increase its service life and keep beautiful. 4.3 : Finally, do not tie the wire to the prefab house, which will lead to the prefab house uneven force and easily cause electric shock accident. 5. How to prepare the foundation for the K style prefab house? In the normal we will offer you the foundation drawing to prepare the foundation. In the normal the K style house is the strip foundation. 6. How many flooring can the K style prefab house build? In the normal we will suggest you to do the K style prefab house in 1 floor or 2 floors. And the highest one is 3 floors if you need. And will suggest you not build the house more than 3 floors by K style house. If you want to build the house more than 3 floors you better choose the design of T house design supported by the H shape steel By the way, if you want to layout the toilet room in the K style prefab house, you'd better made it in the ground floor for the water proofing. 7. The materials option for the thermal insulation: We have 3 materials for your option: They are: EPS sandwich panel, glass wool sandwich panel, rock wool sandwich panel, PU (polyurethane) sandwich panel. |