Gear Drilled Two Roll Rubber Open Mixing Mill Machine

Min.Order: 1
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 1000 ~ 5000

Description
Product Profile:
The rubber mixing mill with stock blender is extensively used in rubber products manufacturing factory to get best mixing dispersion of ingredients and raw rubber. Coupled with stock blender, these mills saves labor and increase productivity.
Rubber Mixing mill is used for mixing and kneading raw rubber, synthetic rubber, thermoplastics or E.V.A.
with chemicals into even materials. The even materials can be fed to calender, hot presses or other processingmachiner3t for making rubber or plastic products. It adopts dual output reducer, the front and behind roller can be driven separately with rolling bearing structure, the roller can adopts hollow center groove roller or drilling hole smooth roller against difference using scope as mixing, refining or press pieces etc.
This machine can be installed stock blender according to customer s request to decrease the labor strength, also equipped with safe device.

Our Machine Advantage:
  The rolls are made of chilled cast iron with vanadium and titanium alloys. The roll face is hard and anti-wear. To heat up or cool down, the rolls are either circumferentially drilled or centrally bored so as to make temperature well proportioned on the roll surface.
The machine is equipped with a hydraulic relief device. When an emergent accident happens, just press down the button and the machine will stop immediate/y.1t is safe and reliable.
The machine adopts electric nip regulating device that provides easy operation.
  Bearings for the rolls are double-row ball bearings, which are convenient for maintenance and have a long service life.
  The transmission system adopts a hard facing gear reducer, which has a compacted structure with higher transmission efficiency, lower noise and longer service life.

Main Technical Parameter:
ModelXK-660XK-550BXK-450XK-400XK-250
(D/L)                     Roll Size660×2130550×1530450×1200400×1000250×620
  Production160~170Kg/once50~60Kg/once30~50Kg/once25~35Kg/once10~15Kg/once
                 Motor Power(KW)220KW90/110KW55KW45/37KW18.5KW
                     Line Speed(M/Min)34.2M28.6M21.8M19.3M15.5M
                  Front Roll RPM16.51615.415.419.8
Gear Ration47/ Dual Output47.5/Dual Output505050
                  Roll Radio1: 1.241: 1.221: 1.271: 1.271: 1.10
              Weight KG4980018500/250001180075003300
  Temp. ControlSteam/Cool water
  Emergency Stop                                                                                                                                                                                                                        2 foot step on 4 sets of press buttons
               Container Volume55.5m³23m³16m³12m³10m³
          Dimension(L*W*H)mm6200×3350×26705365×1946×21934558×1665×20154001×1500×18703220×1500×1290
              Transmission                                                                                                                                                                                                                                                       Low noise gear box

FQA-Problems of customer concern:
About machine performance quality
1.       Q: How to guarantee the quality of outsourcing parts?
         A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q: Which brand of electric part?
         A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3.       Q: How to control the quality?
         A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        Q: When the guide engineer arrive at customer's factory?
          A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        Q: What is the warranty time?
          A: 2 years after machine arrived at factory
2.        Q: How to solve the problem?
          A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.

Tel:+86-532-86133233
Fax:+86-532-86133233
Cell:+86-178-5427-5726

Machine Details 1:


Machine Details 2:

Foreign Customers Visit Factory:


Assembly at factory:

Delivery:













Scroll to Top