                                  ISO certificate tube mill of wet cement ball mill 

1. Tube mill of cement ball mill:
Cement ball Mill is mainly used for grinding various cement clinker or other materials in building material, metallurgical, electric and chemical industries.

2. Sorts & Features:
a. Common Cement Mill
It is mainly used in cycle grinding system, with features of high grinding efficiency, high production, low power consumption. Especially, when grinding slag cement, its performance is more outstanding. Generally speaking. Production could be 10-20% higher, and power consumption 10% lower. Besides, product temperature could reduce 20-40ºC and product fineness is easy to adjust.
b. High fineness & production cement mill
It is mainly used in open flow grinding system. with features of simple equipment system & process flow, saving investment, less building area. Regarding structure, it has advanced & special material separating diaphram device inside, adds activation device to fine grinding chamber, and has discharging grate plate at mill outlet, thus to reduce the size of grinding media at the most and promote the grinding efficiency highly, realise the purpose of high production & low power consumption.

3. Working principle of cement ball mill:
Take the cement mill for example. Material is fed to the rough grinding chamber in the mill through the chute of feeding device. Grinding medium of large size impacts on the material and then material is crushed. Fines go into the fine grinding chamber through double partition. It is further impact and ground by the grinding medium of small size. Production of required fineness flows through the discharging pipe and is discharged from the discharging device. It is separated in the separator. Cold air flows in the mill to reduce the temperature inside. Fine powder is conveyed out of the mill to guarantee the product quality and improve the grinding efficiency.

4. Technical parameters of cement ball mill: 
  Spec./m
(Dia.×Length)
Speed
(r/min)
Feeding Size(mm)Capacity(t/h)Grinding Media Loading(t)Main Motor(KW) Main ReducerWeight(t)
Φ2.2×9.021.5<2514~1539475ZD7069
Φ2.2×9.521.5<2514~1641475ZD7074
Φ2.2×1121.5<2516~1850570ZD80109
Φ2.2×1321.5<2520~2258630ZD80114
Φ2.4×1020.3<2518~2052630ZD80108
Φ2.4×1120.3<2519~22(Open flow)57630ZD80116
22~25(Cycle flow)
Φ2.4×1220.3<2521~23(Open flow)63800MBY710128
24~26(Cycle flow)JDX710
Φ2.4×1320.3<2522~24(Open flow)68800MBY710138
25~28(Cycle flow)JDX710
Φ2.6×1119.7<2524~2669800MBY710138
JDX710
Φ2.6×1319.7<2528~32821000MBY800158
JDX800
Φ3.0×9.018.2<2528~32781000MBY800158
JDX800
Φ3.0×1118.2<2531~35951250MBY800178
JDX800
Φ3.0×1218.2<2532~361001250MBY800182
JDX800
Φ3.0×1318.2<2533~371081400MBY900190
JDX900
Φ3.2×1117.8<2540~451101400MBY900215
JDX900
Φ3.2×1317.8<2545~501281600MBY1000230
JDX1000
Φ3.2×1317.7<2550~55(Cycle flow)1281600JS120-A230
MFY160
Φ3.2×1417.8<2548~531381800MBY1000249
JDX1000
Φ3.5×1117.1<2555~60(Cycle flow)1351800JS120-B220
MFY180
Φ3.5×1317.3<2560~65(Cycle flow)1562000JS130-A275
Φ3.8×1217<2563~68(Cycle flow)1752500JS130-C197
Φ3.8×1317<2565~70(Cycle flow)1902500JS130-C245
Φ4.0×1316.3<2575~80(Cycle flow)2002800JS140-A250
Φ4.2×1115.8<25100~110(Cycle flow)1952800JS140-A248
Φ4.2×1315.8<25110~120(Cycle flow)2303150JS140-C255
Φ4.2×1415.6<25120~135(Cycle flow)2523550JS150-B270
Φ4.2×1515.6<25140~150(Cycle flow)2704000JS160-B288
Φ4.6×1415.1<25140~150(Cycle flow)2854200JS160-C320
Φ4.6×1515.1<25150~160(Cycle flow)3054500JS160-D335










FAQ
Q: Are you a manufacture? 

A: Yes, we are manufacture; our factory was established in 1981.
We focus on providing expert service including design, manufacture, installation & maintenance for the logistic industries & mining equipments.

Q: Terms of Payment: 
A: 30% of the total amount by TT as deposit, the balance to be paid by TT before the machines leaving seller' factory.
Or 100% irrevocable L/C at sight.

 Q: Guarantee period: 
 A: The guarantee period for the above machines is twelve months from the date of putting into use, It is not applicable for quick wear parts.

Q: If i need the complete cement production line. Are you able to help us build it?
A: Yes, we can help you combine a complete cement production line. And give you related professional advice as long as you need. 
There is a rich experience engineer team of us. We had already built many cement projects in China & Overseas. We can do turn key project for you.  


If any questions or needs pls contact me freely at mobile : 0086-18238804869

Scroll to Top