Product Description: |
Product Uses: |
Features: |
Optional Engine: |
Technical Specification: |
Production plant: |
Hot Products |
Excavator | Surface Finishing Screed | Concrete Vibrator | Power Trowel |
Remote Control Trowel | Concrete Mixer | Plate Compactor | Compactor Machine |
Drywall Sander | Steel Bar Cutter | Vibratory Roller | Steel Bar Bender |
FAQ |
1. Do you guarantee safe and secure delivery of products? Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge. |
2. Can you supply the relevant documentation? Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required. |
3. What is the average lead time? For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so. |