OEM Drum Motor Electric Roller Belt Conveyor Drum Pulley Motor Roller

Min.Order: 500
Product origin: Weifang, Shandong, China
Infringement complaint: complaintComplaint
US$ 1 ~ 3

Description
Heavy Duty Oem Drum Motor 24V 48V Electric Roller Belt Conveyor Drum Pulley Motor Roller
Product Description

 

Optional pipe dia(D)thickness(t)Optional  shaft dia(d)Drum Length(W)Shaft Length(L)Materialsurface treatment
321.58/1040-205050-2100Carbon steel/ Stainless steel/ Aluminum alloy / PVCGalvanized, Chrome,Polyurethane
381.2/1.5/2.012
421.5/2.012
501.2/1.5/2.012/15
571.5/2.012/15/20
601.5/2.0/3.020
762.5/3.020


   

Material

Aluminum 6061,6063, iron alloys, stainless steel, hardened metals, copper, bronze, brass

Processing Craft

Drawings→ mould making →extrusion → CNC machining→surface treatment →product checking→ packing →delivery

Tolerance

± 0.02mm

Surface Treatment

Chrome Plating, Zinc Plating, Nickel plating, Electrophoresis, Anodization, Polishing, Powder coating, Sandblasting, Passivation, Spray painting, Etc.

Quality Assurance

ISO9001:2015 Certified, SGS Certification

Mainly Testing Facility

Three-dimensional measuring instrument (CMM), Salt spray test box, Dynamic balance detector, Pneumatic detection

Lead time

Usually 10-15 days after order confirmed

Features & Advantage

1.High finish appearance, smooth surface roughness is Ra1.6 after machining.

2.The machining precision is high and the assembly structure is seamless.

3.No granules, no spots and no painting peel off in appearance.

4.Smooth appearance, corrosion resistance.

5. Pass Salt Spray Test with 108 Hours.

6.Pass Adhesion Cross-Cut Test and 3M Glue Test.

Application

3C industry, lighting decoration, electrical appliances, auto parts, furniture parts, electric tool, medical equipment, intelligent automation equipment, other metal casting parts.


     1. Can you accept OEM?
     A: Yes, we can. We had more than 8 years OEM experience.

     2. What's the MOQ of order?
     A: MOQ is 50 PCS

     3. Can you make a general proposal for us if we have no technical engineer?
     A: Yes, sure. We can offer the professional suggestions and proposal design for you freely.

     4. How long is the delivery time?
     A: Most simple and standard type is 3~7 working days, non-standard design depends on per order.

     5. How about your quality control ?
     A: 48 hours testing before the shipment, there is a specialized quality control engineer to check the
     processing quality for each step and strictly obey the ISO,CE rules.

     6. How about after-sale service?
     A: We will make a completely installation and manual operation attached with shipment. If the customer
     still have question aboard, we will guide the customer by phone, email, or video firstly, engineers available
     to service overseas if necessary, the customer will bear all travel expense.


              If there's anything I can help, please feel free to contact with me.
Product Tag:
Related categories:
Scroll to Top