Customized Plastic Injection Tool for Side Marker Light Shell

Min.Order: 1
Product origin: Shanghai, China
Infringement complaint: complaintComplaint
US$ 500 ~ 30000

Description
Plastic injection mould for Side Marker Light shell
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to  be before mold making. 
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.

Mould material

Plastic mould material: P20 steel, 718, 2738,H13, NAK80,2344,2343,S136,etc....

Fast mould design

can be within 1-3 working days after getting customer's drawings

Lead time

Plastic moulds :3- 6 weeks after getting the mould desig n confirmation.

Mould testing

All of the moulds can be well tested before the shipments. Videos for testing the moulds are available.

Minimum order:

small orders can be accepted.

Production capacity

50 sets/month
 

Port

shanghai

Runner

Hot/cold

Payment terms

L/C T/T Western Union Money Gram.

Mould making service

OEM/ODM service available.

After sales service

Available by our staff with more than 10 years of working experience in this field.

Good packages

In strong wooden pallets to avoid any damages during the long transportation












Why Customers Choose Us?
We have been engaged in this field for 15 years, we've served customers from the United States, the United Kingdom, Spain, Australia, Singapore, Russia and other countries.
Professional Certification
Quality control and technology improvement
•ISOIS09001:2000
•SGS certificate
•The complete quality control system.
Precision durable mold.
•3 CNC: Precision 0.005mm
•1 Three dimension:1Precision 0.001mm 
•1 wire drive slowly: Precision 0.002mm
•2 Mirror discharge: Precision 0.005mm
100% Guaranteed Quality
•100% tested(Not Just Batch Tested)
•SOP standard production.
•IQC(tested all in matical )-IPQC(tested first parts and prodcut)-FQC(tested finished parts)-OQC(Shipments) 
•10 professional quality control inspectors
Competitive price and service
•Delivery time: 2-3 Weeks after order
•Provide new design for customers' requirements
•Provide DFM Report,Moldflow,Mould Design,MPR,QC Report, Injection parameter sheet,Testing video.
•Free provided sample.
•10-20% cheaper than other competitors
•Return the entire mould cost  if you order  500,000pcs  product.
•Life-long guarantee period, which is much longer among this field.
Product Tag:
Related categories:
Scroll to Top