Product Description |
Products | Name | Rubber pedal |
Products category | rubber molded product |
Material | EPDM,NR,SBR,Nitrile, Silicone, Fluorosilicone, Neoprene, Urethane(PU), Polyacrylate(ACM), Ethylene Acrylic(AEM), HNBR, Butyl(IIR), plastic like material (TPE, PU, NBR, silicone, NBR+TPE etc) |
Size | All size and thickness available. |
Shape | capable of all shapes as per drawing |
Color | Natural,black, Pantone code or RAL code, or as per client's samples or requirements |
Hardness | 20°~90° Shore A, usually 30°~80° Shore A. |
Surface finishing | Texture (VDI/MT standard, or made to client's sample), polished (high polish, mirror polish), smooth, painting, powder coating, printing, electroplating etc. |
Drawing | 2D or 3D draiwng in any image/picture format is OK |
Free sample | Yes |
OEM/OEM | Yes |
Application | Household, electronics, for vehicles like GM, Ford, Honda. Machinery, hospital, petrochemical, and Aerospace etc. |
Market | Europe, North America, Oceania |
Quality certification | ISO 90001:2008, TS16949, FDA, REACH, ROHS, SGS |
QC | Every order production will get more than 10 times regular check and 5 fives times random check by our professional QC. Or by Third party appointed by customer |
|
Mold | Molding Process | Injection molding, mold processing, extrusion |
Mould type | processing mold, injection mold, extrusionmold |
Machines | 350T vacuum pressing machine and other pressing machine at 300T,250T and so on |
Tooling equipment | Rubber tension tester, Rubber vulcanization instrument, Durometer, calipers, ageing oven |
Cavity | 1~400 cavities |
Mould Life | 300,000~1,00,000 times |
|
Production | Production capacity | finish each mold of product in 3 minutes and working on 3 shifts within 24 hours |
Mold lead time | 15~35 days |
Sample lead time | 3~5 days |
Production time | usually 15~30 days, should be confirmed before order |
Loading port | Hangzhou, Shanghai, Ningbo or as required |