Vacuum Insulating Glass Machine Low E Glass Coating Remove Machine

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 22000 ~ 35000

Description

Application


Auto Low-E deleting machine can be connected with Insulating glass production line, and is the vital machine for coated glass IGU production. It is used to delete or remove the coating file of Low-E glass.

Feature
  1. Laser cutting, CNC bending, high strength carbon steel with spray plastic back plate
  2. PLC control system, Human machine interface touch screen
  3. Low-E glass coating automatic identification
  4. Four Axis servo control system
  5. Two-way glass loading direction
  6. Auto detect glass size
  7. Abrasive wheel contact surface pressure auto adjustment system
  8. Auto dedusting function
  9. Auto abrasive wheel modification function
  10. Control system intelligently memorize batch processing function
  11. Linear guider location mechanism
  12. Safety protection device
  13. Abnormal shape coated glass deleting function
Parameter
Max. glass processing size2500×4000mm
Min. glass processing size350X500mm
Glass thickness3-19mm
Edge deleting width10∞
Glass conveyor speed42 m/min
Edge deleting speed32 m/min
Abrasive wheel width10mm/12mm/15mm
Air supply0.5-0.8Mpa  0.3m3/min.
Total power3P 380V 50HZ 3.35Kw
Dimension9600X2500X3650mm
Weight2600Kg








Mostly asked questions below:

1. What is your soonest lead time?
  A: 60 days for whole production line, 30 days for single machine.  Special requirement pls check with sales.

2. How do you arrange the shipment?
  A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.

3. Guarantee ?
  A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.

4. How we can install the machines?
  A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.

5. How about the after service?
  A: Spare parts within 72 hours.
  Experienced technical sales sort out most of your questions.
Tens of service engineers ready for on-site service and instruction.

Product Tag:
Related categories:
Scroll to Top