300L 500L Stainless Steel Beer Brewery Equipment for Sale

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 25000 ~ 36000

Description


300L 500L Stainless Steel Beer Brewery Equipment for Sale


 
2 Vessel Brewhouse 3 Vessel Brewhouse 

Mash/Lauter tun+Brew kettle/whirlpool tank

1.Lauter&storage tank+brew kettle/whirlpool tank

2.Lauter&whirlpool tank ,+brew kettle

3.Lauter&HLT +brewkettle/whirlpool tank

Combined 3 Vessel Brewhouse 4 Vessel Brewhouse
1.Mash/lauter tun+ brew kettle +whirlpool tank

2.Mash tun+ lauter tank + brewkettle/whirlpool tank

 Mash tun +lauter tank + brew kettle+whirlpool tank


 
UNitComponentsCapacity Specification 
Milling Miller 200KG/HDouble Roller,Noise<60db
Brewhouse Mash/Lauter tun500LMashing Process:Decoction.Infusion.Multi-step infusion 
  Brew Kettle/Whirlpool Tank 500L
Heating source:Steam,Electric,direct fire
SUS304/Red copper
  Hot Water Tank  800L Heating source:Steam,Electric,Gas
  Heat exchanger 5 SQM Stainless steel plate
 Fermentation tank  Fermentation Tank 
(The number according to customer requirements)
 500L or 1000L Top manway/Side manway
Drying hop port to brew IPA
Dimple Plate Cooling jacket
Carbonation port to fill CO2
 Yeast Adding Tank5-10 L SUS304 Stainless Steel
 Cooling System   Glycol Water tank 1500L Equiped with PU level indicator
 Chiller  5Hp UL/CE certified electric elements,Copeland compressor
Pump3T/H 
Cleaning SystemDisinfection Tank50-100LSUS304 full welded
Alkali Tank50-100L
Pump3T/H
Control System Control Cabinet PID or PLC 
Optional

Auger System
Grain Case
Grist Hydrator 
Piping flow panel for Brewhouse
Brewhouse Separate PLC Controller 
Steam Boiler Customized 
...






Packaging Details

1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.



1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of your brewery;

2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and locate food, and hotel shall be afforded by the buyer

3. The installation period is about 15 days including assembling brewing tanks and training the operator.  It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended installation.

4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer.

5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. should be installed separately. If needed, cost calculate additionally.

6. Brewing technology, brewing formula, can be offered available

7. More spare parts are available to offered freely.






Product Tag:
Related categories:
Scroll to Top