1000L 2000L 3000L Commercial Beer Brewhouse Fermentation Tank with Ce Certification

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 50000 ~ 90000

Description

2000L Micro Brewery Machine Beer Brewing Equipment For Making Beer


Brewing SystemComponentsCapacity Specification 
Grinding SystemMiller 500KG/HDouble Roller,Noise<60db
Brewhouse System Mash/Lauter tun2000L

Mashing Process:Decoction.Infusion.Multi-step infusion 
Heating source:Steam,Electric,Gas 
SUS304/Red copper

Interior:2.5-3mm

Exteior:3-4mm

Brew Kettle/
Whirlpool Tank
2000L
Fermentation SystemFermentation Tank 2000L/4000LTop manway/Side manway
Drying hop port to brew IPA
Dimple Plate Cooling jacket
Carbonation port to fill CO2
Cooling System Glycol Water tank 4000lEquiped with PU level indicator
Cooling machinery7P*2 
Cleaning System Disinfection Tank150LSUS304 full welded
Alkali Tank150L
Pump3T/h
Control System Control Cabinet Manual/PLC/
HMI
Manual/Semi-automatic/Automatic
Optional Auger System
Grain Case
Grist Hydrator 
Piping flow panel for Brewhouse
Brewhouse Separate PLC Controller
Customized 

Packaging Details

1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.


1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of your brewery;

2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and locate food, and hotel shall be afforded by the buyer

3. The installation period is about 15 days including assembling brewing tanks and training the operator.  It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended installation.

4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer.

5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. 
should be installed separately. If needed, cost calculate additionally.

6. Brewing technology, brewing formula, can be offered available

7. More spare parts are available to offered freely.






Product Tag:
Related categories:
Scroll to Top