Bag Packing Anti Rutting Additive Mix Asphalt Modifier Road Plastic

Min.Order: 1
Product origin: Beijing, China
Infringement complaint: complaintComplaint
US$ 0.69 ~ 1.85

Description

Bag Packing Anti Rutting Additive Mix Asphalt Modifier Road Plastic 

Long life asphalt pavement

Product Description

 

    Bag Packing Anti Rutting Additive Mix Asphalt Modifier Road Plastic is one of the commonly used materials in the asphalt road project, which can enhance the surface performance of the aggregate to resist the road ruts and extend the service life of the road.

    ZTA-RA Anti Rutting Asphalt Additives is a directly added into asphalt mixing plant asphalt modifier, which improved the high temperature and low temperature performance of asphalt mixture. The method of using is directly mixing with aggregate and bitumen to modify asphalt mixture.  Asphalt mixing temperature is 175ºC±5ºC, normally suggested dosage is 0.2%-0.4% of asphalt mixture mass, small dosage can get higher performance. For special engineering needs, please consult us.

    ZTA-RA combines long-life asphalt pavement, asphalt mixture viscoelastic theory. ZTA-RA greatly improves dynamic stability of asphalt mixture, water stability, durability, and improve the anti-aging of asphalt mixture. The adhesion increased between bitumen and minerals, it can be added to the Gap Graded Asphalt Mixture replace of SMA asphalt mixture, no more fibers and SBS, with decreasing bitumen usage and improving intensity and durability of asphalt. With its outstanding cost-effective advantage, ZTA-RA is an ideal for the purpose of preventing disease on asphalt pavement.

 

Product Parameters

Specification:

ZTA-RA Bag Packing Anti Rutting Additive Mix Asphalt Modifier Road Plastic
ItemUnitIndex
Particle Sizemm3-5mm
Densityg/cm³≤1.00
Melting Indexg/10min≥1.00
Ash Content%≤5

 

 Packing:

Packing

3kgs or 4kgs per hot-melt bag, 24 kgs per bag.
500KGS/ TON OF BAG, 25KGS/BAG, OR AS CUSTOMZIED

Loading:16 tons per 20 feet container. 27 tons per 40 feet container.
Storage:ZTA Anti-rutting additive can be stored at room temperature.
Transportation:Convenient to transport, no need special vehicle
 
 

Our Advantages

Dosing by quantity to be produced. It facilitates the use of many small batch projects, and facilitates long-distance use and storage.
2Customers can produce extremely thin asphalt mixes that can withstand high loads. This definitely improves the mechanical performance of the road and significantly increases its service life.
3The strong viscosity of ZTA-RA increases the softening point of asphalt, reduces the sensitivity to temperature of asphalt, and increases the adhesion of bitumen to mineral aggregates.
4Packaged in "ton bag" or hot-melt bags, it is easy to transport and store at room temperature.
5Dosing by quantity to be produced. It facilitates the use of many small batch projects, and facilitates long-distance use and storage.
6For all types of surface and base asphalt layers.
7Simple construction process: It's ready-to-use product. dosed directly into the pugmill of asphalt plants. The asphalt modification process and the mixture mixing production are integrated into one process.
8More environmentally friendly:The omission of the bitumen modification process saves energy. Convenient hot-melt packaging reduces plastic waste.
9Better economic costs:Abandon the production process of modified bitumen to reduce costs, and there is no need to lease or purchase modified equipment. Good road applications reduce road maintenance costs.

 

Application Scope

   Bag Packing Anti Rutting Additive Mix Asphalt Modifier Road Plastic is mainly used in the middle, upper and lower layers of asphalt pavement construction and maintenance engineering for all types of surface and base layers.

* Heavy-duty channelized traffic roads, long and steep roads, and roads in mountainous and heavy hilly areas with more sharp bends, which are more severely damaged by rutting.
* Sections with heavy traffic and heavy load.
* Important road sections such as highways, crossroads, airport runways, and municipal arterial roads.
 

 

 

Certifications


Won a Patent of modified bitumen viscosity detection.
Won a Patent of Pavement Patch Car.
Won a Patent of Pavement Crack Sealant.
Won a Patent of Production of Modified Bitumen from Recycled Materials.
Won a Patent of Large proportion of admixture modified bitumen equipment.

Formulate industry standards for colored asphalt binder.
Formulate industry standards for seamless expansion joints in bridge binder.
Formulate industry standards for SBS modified bitumen equipment.

Won Quality Management System ISO9001:2015 certificate.
Certified by Intertek Group.
Certified by SGS Group.


Key technology and engineering application of waste tires paving high performance asphalt pavement Won National Science and Technology Progress Award.
Pavement Crack Treatment Technology won First Prize of Science and Technology of China Highway & Transportation Society.
High stability and low emission rubberized asphalt technology won China Industry-University-Research Cooperation Innovation award.

Company Profile

 

    Beijing Zhongtian Road-Tech Co.,Ltd. is the Board of Directors of China Transportation Association and Transportation Committee of China Technological Market Association, with expert technical R&D team, continuous innovation ability, rich engineering experience and sufficient capacity. Also we participated in designated road material industry standard certificates.
    Headquarters in the capital Beijing, 3 product production bases in Baoding and Handan, Hebei and Ordos, Inner Mongolia. With an annual output of 60,000 tons of asphalt additives, 10,000 tons of fusible powder additives (asphalt SBS), 5,000 tons of drainage pavement additives / porous pavement additives, 40,000 tons of anti-rutting agent / anti-rutting additives ARA / heavy load road additives, 4,000 tons of ultra-thin pavement overlay additives (preventive maintenance additives), 1,000 tons of flame-retardant & smoke-suppressing pavement for tunnel additives, 1,000 tons of melt snow and anti-freeze pavement additives. 5,000 tons of crack sealant and 2 million meters of adhesive crack tape, it can fully meet custom needed.

   

 

 

 

Product Tag:
Related categories:
Scroll to Top