Wear Resistant Graphite Filled PTFE Plastic Sealing Material Spherical Ring

Min.Order: 10
Product origin: Zhenjiang, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 0.25 ~ 0.3

Description
 
Product Description

Guide ring, guide sleeve, support ring, guide strip also called a support ring,it is a used in hydraulic cylinder or cylinder piston or piston rod, supporting a piston or piston rod movement of parts, it can prevent the piston or piston rod in the movement process and the cylinder body occurred in direct contact and friction, to protect the cylinder body and the piston or live plug rod is not damaged role.

Advantage
1 Good wear resistance
2 Avoid contact with metal
3 Can suppress mechanical vibration
4 Because of the wear ring in the role, allow a larger radial clearance
5 Grooves are simple and easy to install
6 Low maintenance costs based on the above advantages, so it is widely used

Detailed Photos

 

Product Parameters

 

 
DdLD3

Limit Deviation
D4

Limit Deviation
l1l2l3

Limit Deviation
S5

Limit Deviation
251710250
-0.16
250
-0.20
5.51.54+0.10
0
40
-0.10
32243232
40324040
251512.5250
-0.18
250
-0.25
5
32223232
40304040
50405050
56465656
63536363
503520500
-0.22
500
-0.30
6.51.557.5
56415656
63486363
70557070
80658080
90759090
10085100100
11095110110
806025800
-0.26
800
-0.35
8.326.310
90709090
10080100100
11090110110
125105125125
1401201401400
-0.40
+0.10
0
160140160160
180160180180
1251103212512513310+0.12
0
12.5+0.10
0
140115140140
160135160160
180155180180
200170362000
-0.35
2000
-0.50
15.5312.5+0.12
0
150
-0.12
220190220220
250220250250
280250280280
320290320320
360330360360
400360504000
-0.50
4000
-0.60
20416+0.15
0
200
-0.15
450410450450
500460500500
 
Our Advantages
1. Your inquiry will be replied within 2 hours during working time, within 24hours when rest time.
2. Our working time is 7:30am-17:30pm, Monday to Saturday.
3. General samples time can be arranged within 2-5days.
4. Orders will be produced exactly as request and approved samples.
5. When mass production, we send photos to show the production line and confirm the estimate time again.
6. At the end of mass production, photos and samples will send to you for approval. You can arrange the inspection.
7. Before shipment, our QC will have inspection to make sure the quality
8. We always try best to ensure every order to delivery in time.
 
Payment Terms

1. T/T, Cash, L/C
2. 30% deposit, 70% balance before shipment.
3. Lead time: 15 days after received deposi for 2 tons.
4. Delivery way: By sea, By air, By EMS, DHL,UPS,TNT, FedEX.

 
Packing & Delivery

For sample: By EMS, DHL,UPS, TNT,FedEx  Around 5-7 working days to arrive.

 
For Bulk order

1. Qty of 2 tons within 15 days
2. Via sea
3. Delivery time: we finish production in 15 days for 2 tons
4. For 20 GP, may need around 30 days

 

Company Profile

Zhenjiang Chunhuan Sealing Materials Co.,Ltd (Group) Is The Member Of China Fluoroplastics Commissions.Our Company Has More Than 30 Years' Professional Production Experience,Familiar With Modern Equipment And Techniques.  

We specialize in PTFE which include sheet, bar, tube, tape, film, gasket,  braided packing and all special type components. We can meet your special demand.
Scroll to Top