Guide ring, guide sleeve, support ring, guide strip also called a support ring,it is a used in hydraulic cylinder or cylinder piston or piston rod, supporting a piston or piston rod movement of parts, it can prevent the piston or piston rod in the movement process and the cylinder body occurred in direct contact and friction, to protect the cylinder body and the piston or live plug rod is not damaged role.
Advantage
1 Good wear resistance
2 Avoid contact with metal
3 Can suppress mechanical vibration
4 Because of the wear ring in the role, allow a larger radial clearance
5 Grooves are simple and easy to install
6 Low maintenance costs based on the above advantages, so it is widely used
D | d | L | D3 | Limit Deviation | D4 | Limit Deviation | l1 | l2 | l3 | Limit Deviation | S5 | Limit Deviation |
25 | 17 | 10 | 25 | 0 -0.16 | 25 | 0 -0.20 | 5.5 | 1.5 | 4 | +0.10 0 | 4 | 0 -0.10 |
32 | 24 | 32 | 32 | |||||||||
40 | 32 | 40 | 40 | |||||||||
25 | 15 | 12.5 | 25 | 0 -0.18 | 25 | 0 -0.25 | 5 | |||||
32 | 22 | 32 | 32 | |||||||||
40 | 30 | 40 | 40 | |||||||||
50 | 40 | 50 | 50 | |||||||||
56 | 46 | 56 | 56 | |||||||||
63 | 53 | 63 | 63 | |||||||||
50 | 35 | 20 | 50 | 0 -0.22 | 50 | 0 -0.30 | 6.5 | 1.5 | 5 | 7.5 | ||
56 | 41 | 56 | 56 | |||||||||
63 | 48 | 63 | 63 | |||||||||
70 | 55 | 70 | 70 | |||||||||
80 | 65 | 80 | 80 | |||||||||
90 | 75 | 90 | 90 | |||||||||
100 | 85 | 100 | 100 | |||||||||
110 | 95 | 110 | 110 | |||||||||
80 | 60 | 25 | 80 | 0 -0.26 | 80 | 0 -0.35 | 8.3 | 2 | 6.3 | 10 | ||
90 | 70 | 90 | 90 | |||||||||
100 | 80 | 100 | 100 | |||||||||
110 | 90 | 110 | 110 | |||||||||
125 | 105 | 125 | 125 | |||||||||
140 | 120 | 140 | 140 | 0 -0.40 | +0.10 0 | |||||||
160 | 140 | 160 | 160 | |||||||||
180 | 160 | 180 | 180 | |||||||||
125 | 110 | 32 | 125 | 125 | 13 | 3 | 10 | +0.12 0 | 12.5 | +0.10 0 | ||
140 | 115 | 140 | 140 | |||||||||
160 | 135 | 160 | 160 | |||||||||
180 | 155 | 180 | 180 | |||||||||
200 | 170 | 36 | 200 | 0 -0.35 | 200 | 0 -0.50 | 15.5 | 3 | 12.5 | +0.12 0 | 15 | 0 -0.12 |
220 | 190 | 220 | 220 | |||||||||
250 | 220 | 250 | 250 | |||||||||
280 | 250 | 280 | 280 | |||||||||
320 | 290 | 320 | 320 | |||||||||
360 | 330 | 360 | 360 | |||||||||
400 | 360 | 50 | 400 | 0 -0.50 | 400 | 0 -0.60 | 20 | 4 | 16 | +0.15 0 | 20 | 0 -0.15 |
450 | 410 | 450 | 450 | |||||||||
500 | 460 | 500 | 500 |
1. T/T, Cash, L/C
2. 30% deposit, 70% balance before shipment.
3. Lead time: 15 days after received deposi for 2 tons.
4. Delivery way: By sea, By air, By EMS, DHL,UPS,TNT, FedEX.
For sample: By EMS, DHL,UPS, TNT,FedEx Around 5-7 working days to arrive.
1. Qty of 2 tons within 15 days
2. Via sea
3. Delivery time: we finish production in 15 days for 2 tons
4. For 20 GP, may need around 30 days
Zhenjiang Chunhuan Sealing Materials Co.,Ltd (Group) Is The Member Of China Fluoroplastics Commissions.Our Company Has More Than 30 Years' Professional Production Experience,Familiar With Modern Equipment And Techniques.