NO | Type | Specification | Weight(kg) | Bottom(mm) | Dia(mm) |
1 | 7/150/813/50 | 102+114+127+140+152+178 | 20.8 | 2.5 | 2 |
2 | 8/150/813/50 | 89(75)+89+102+114+127+140+178 | 21.6 | 2.5 | 2 |
3 | 8/150/902/50 | 89+102+114+127+140+152+178 | 22.6 | 2.5 | 2 |
4 | 8/150/1016/50 | 102+114+127+140+152+178+203 | 23.6 | 2.5 | 2 |
5 | 8/150/1143/50 | 114+127+140+152+178+203+229 | 23.9 | 2.5 | 2 |
6 | 9/150/991/50 | 89(75)+89+102+114+127+140+152+178 | 26 | 2.5 | 2 |
7 | 9/150/1245/50 | 102+114+127+140+140+152+178+203+229 | 27.3 | 2.5 | 2 |
8 | 10/150/1194/50 | 89(75)+89+102+114+127+140+152+178+203+229 | 28.4 | 2.5 | 2 |
9 | 10/150/1334/50 | 89+102+114+127+140+152+178+203+229 | 30.8 | 2.5 | 2 |
10 | 11/150/1422/50 | 89(75)+89+102+114+127+140+152+178+203+229 | 19.3 | 2.5 | 2 |
When we finished the production of the fence, we will do the test for the panel and post
We also can do the test as you request.We can provide the test certificate.
We have the specialist to test the panel in the production period and have the top machine of powder coating to promise the quality.
We will send the test photos and video to our clients.
Q: What is the delivery time?
A: Usually 7-15 days after receiving 30% deposits.
Q: What is the payment term?
A:T/T 30% as deposit,the balance against the copy of B/L. Or 100% L/C at sight Or 30% deposit,70% L/C st sight
Q: How to transport the products?
A: Usually transport by sea. or land transport.
Q: What is the shipping cost?
A: Our forwarders and we have good cooperation many years, you will get the best price.