Plastic Forming Method | Injection | Color | White |
Shape | Granular | Quality | Stable |
ODM/OEM | Accept | Grade | Injection Grade |
Transport Package | 25kgs/Bag | Specification | 65*40*15cm |
Origin | China | HS Code | 3908101101 |
Production Capacity | 1000kgs/Week | port of loading | shanghai port |
Product features | High strength, high rigidity, good heat resistance, low water absorption, and good processing |
Performance | Among them, there is no floating fiber reinforced nylon 6 grade, and the surface gloss is good |
Product Application | Used in various machine fan blades, electrical housings, sports equipment, power tools, etc |
Product Description | Applications |
10%,20%6 10% glass fiber reinforced,20% mineral filled PA6 | Injection molding |
Excellent heat stability | Good mechanical properties balance |
Properties | Test Method | Test Condition | Unit | Typical Values |
Physical properties |
Specific Gravity | ISO 1183 | 23ºC | g/cm3 | 1.35 |
Ash | ISO 3451 | 800ºC,30min | % | 30 |
Mechanical properties |
Tensile Strength | ISO527 | 50mm/min | Mpa | 125 |
Elongation at Break | ISO527 | 50mm/min | % | 2.5 |
Flexural Modulus | ISO178 | 2mm/min | Mpa | 8500 |
Izod Notched Impact Strength | ISO180 | 23ºC | kJ/m2 | 9 |
Thermal properties |
Heat deflection temperature | ISO75 | 1.80MPa | C | 185 |
Melting Point | DSC | - | C | 222 |
Other properties |
Mold Shrinkage | internal test method | 48 hours after tool | % | 0.3-0.5 |
Flammability | TL1010 | - | mm/min | 39 |
Note: The data above is a typical value for reference, not a guaranteed value. The data will vary with tool design such as gate type , gate location, gate number, injection molding process and part thickness. The data will vary with different color as well. Prior to use the material, please consult with Sunway polymer. |
Processing Conditions | Range |
Melt Temperature | 240-270ºC |
Barrel Temperature | Rear | 240--250ºC |
Center | 255--265ºC | |
Front | 260--270ºC |
Mold Temperature | 50-80ºC |
Pre-Dry needed | 100ºC, 4-8h |
Note: The above process condition is only for reference. The actual process should be adjusted according to different types of machines, mold design and product design |
Company Information:ANHUI SINCERE EXPORT & IMPORT CO., LTD. |
FAQ |
1.Samples leading time : 1-2 weeks after passed our test;
2.Bulk order leading time : 2-4 weeks ( customized materials)
3.Samples are delivered by FEDEX DHL ,TNT , UPS,Samples fee will be refund when the first bulk order comes
4.Payment Term: T/T or L/C at sight;
5.Minimum Order Quantity: 1 MT
6.Delivery Time: Lead-time is around 7-14 working days after we receive the advance payment. It varies according to different products and quantity.
7.The quality standard refers to the sample. And about quality issues we provide free tech-support
Contact Us |