1.Application:
This equipment is suitable for large cross-section and large length power cables stranding, and can be used for stranding pre-back twisting or non-pre-back twisting cable core laying up, with additional function of steel wire armoring and steel belt armoring.
3.1 | Ø1600 fork type rotating payoff frame | five set |
3.2 | Well type wire frame | five set |
3.3 | Wire assembly die frame | one set of each size |
3.4 | Filling rope pay-off frame | two sets |
3.5 | Steel wire pay-off frame (54 heads) | two sets |
3.6 | Steel wire guiding frame (27 heads) | four sets |
3.7 | Wire pre-twisting device (108 heads) | one set |
3.8 | Three rows of pressure mold frame and dividing board | one set |
3.9 | 630/2 non-metallic taping device | one set |
3.10 | 800/2 metal taping device | One set |
3.11 | Meter counter | one set |
3.12 | 5T rotary traction device (with meter counting) | one set |
3.13 | Ø3150 rotary take-up device | one set |
3.14 | Electric lifting platform | one set |
3.15 | Security fence | one set |
3.16 | Electrical control system | one set |
Main technical parameters | ||
1 | Inlet single wire diameter | ≤Ø50mm |
2 | Maximum stranded outer diameter | Ø120mm |
3 | Maximum twisting speed of drum/pay-off | 35r/min |
4 | Stranding pitch | Stepless adjusted |
5 | Maximum traction line speed: | 50m/min |
6 | Maximum rotation speed: | 35m/min |
7 | Maximum traction force | 5T |
8 | Maximum speed of non-metallic taping | 500r/min |
9 | Non-metallic wrap size: | Ø630*Ø80*(15-80)mm |
10 | Non-metallic taping pitch | Stepless adjusted |
11 | Maximum speed of steel belt taping | 350r/min |
12 | Steel belt wrap size | Ø800*Ø130*(15-60)mm |
13 | Steel belt taping pitch | Stepless adjusted |
14 | Main pay-off unit size | PND: 1600mm |
15 | Steel wire pay-off size | PND: 630mm (108 heads) |
16 | Take-up size | PND: 3150mm |
17 | Filling rope specifications | Ø400×Ø22×360mm ; |
Ø800×Ø52×320mm | ||
19 | Pay-off rotating motor | 15KW(AC) |
20 | Non-metallic taping motor | 7.5KW(AC) |
21 | Metallic taping motor | 18.5KW(AC) |
22 | Traction motor | 18.5KW×2(AC |
23 | Take-up rotary motor: | 55KW(AC) |
24 | Equipment center height | 1000mm |
1. Delivery date: 60 working days
2. Payment: TT or L/C
3. Packing: plastic packing, ensuring the goods' safety during the transportation.
4. Install and training service: 2 professional engineers who has over 10 years overseas installation and cable manufacturing training experience.
Detailed services:
1. Our experienced technical team provide customized project plan for you according to your specific needs.
2. We guarantee to offer new superior goods.
3. We would like to send technicians to the installation site to help provide technical instruction, quantity estimation,installation, preliminary testing,and help start up operation. If there is any problems with the product, we will reply within 12 hours and arrive at the site within 36 hours.
4. After installation,We'll send skilled Technical personnel to conduct a preliminary test and answer any problems emerged. We will bear all the costs of maintenance, tests or retest within the scope of our duty stipulated in contract.
5. Within the validity of the contract,if the equipment can not be used properly due to our unqualified goods, improper files or the fault of our instructor, we'll change the products at once without compensation and take charge in all expenses of re-installation.