Description
ZSE110 Corotating Parallel Twin Extruder Screw Shaft and Elements with ISO and CE Approval
Production description:
Production name: | Screw element | Model Number: | ZSE110 |
Extrusion equipment: | Leistritz | Material | WR5 |
Place of Origin | SiChuan, China | Application | PE PP Plastic |
Production ability | 300m / Per month | Diameter | 109mm |
Our work range: screw φ 15.6mm~ φ500mmWe supply twin screw set for PP PE Plastic Cement fiber extrusion. The surface finishing is polishing can meet RA0.4. Inner spline precision can meet Gear precision level 6 which make seamless connection with each screws. And the bimetallic alloy material with soft core can protect the shaft. High torque high precision and with good wear resistance.
Co-rotating twin screw elements for -APV -KOBE -OMC-Buss -ICMA -Toshiba-Clextral -Labtech -USEON-Lantai - others-JSW -Leistritz -Keya -Maris Quality Control
1. Materials control
1. All the materials are purchased from the domestic brands or Eurpean twin-screw specialty materials suppliers,which tested by elemental analysis and metallurgical inspections to ensure the quality.
2. The internal splines is checked by the spline plug to ensure interchangeability of the elements
3. All components are machined by CNC machines to ensure the shapes and tolerances of the elements
4. Adopt the European high-speed steel powder processing technology,and do the treatment according to the strict heat treatment 4.process to ensure the wear and corrosion performance same as the foreigh brands.
5. Perfessioal technical team can not only provide timely and accurate mapping sample design but also the combination of elements of technical services.
6. There are various prepared technical information and the fitxtures for the various brands extruders to ensure the timely lead time.The common components have a lot of stock, even the new one, it can be delivered within 45days.
7. The modern management system can ensure the products 100% qualified and tracked.
Heat treatment by Ourself
As we all know, heat treatment is very important in the screw production process. In order to ensure the quality of products, Joiner has purchased professional heat treatment equipment to produce, so that we can control the construction process by ourselves. In China, we are the only company that does heat treatment by ourselves, and the heat treatment of screw components made by Nanjing factory is processed by outsiders, so the quality of products can not be completely guarantee.
Types of the Screw Segments
Convey Screw Segment
Mixing Screw Segment
Kneading Block & Disk
Transition Screw Element
Deep groove transfer element
Screw element for side feeder
1-flighted,2-flighted,3-flighted screw elements
Screw Element Materials:
For wear application:
* Tool Steel : W6Mo5Cr4V2;
* PM-HIP material : SAM10,SAM26,SAM39,CPM10V,CPM9V
For corrision application:
* Nitrided Steel: 38CrMoAI;
* PM-HIP material : SAM26,SAM39,CPM10V,CPM9V
For wear and corrision application:
* PM-HIP material:SAM26,SAM39,CPM10V,CPM9V
Other materials:
Stainless Steel: 316L,C276 etc.
By working closely with customers in choosing optional materials,we can minimize wear and tear and associated costs.
Quality Control
1.Materials Control:
All the materials are purchased from the domestic brands of Eurpean twin screw specialty materials suppilers, which tested by elemental analysis and metallurgical inspections to ensure the quality.
2.The internal splines is checked by the spline plug to ensure interchangeability of the elemets
3.All components are machined by CNC machines to ensure the shapes and tolerances of the elements.
4.Adopt the European high speed steel powder processing technology, and to the heat treatment according to the strict heat treatment process to ensure the wear and corrosion performance same as the foreigh brands.
5.Professioal technical team can not only provide timely and accurate mapping sample design but also the combination of elements of technical services
6.There are various prepared technical information and fitxtures for the various brands extruders to ensure the timely lead time. The common components have a lot of stock,even the new one, it can be delivered within 45days.
7.The modern management system can ensure the product 100% qualified and tracked.
Our strengths are based on many years experience supplying the following:
* Competitive costs per unit of production
* Fast turn round for collection and delivery on refurbished parts
* Parts available from stock for a wide range of extruder makes
* Comprehensive inspection procedure on all parts prior to dispatch
* A time proven quality service
* Latest manufacturing techniques and metallurgy, ensuring consistent and reliable performance of parts
* Customized solutions to meet specific needs.
Heat Treatment by Ourself
As we all know,heat treatment is very important in the screw production process,In order to ensure the quality of products ,Joiner has purchased professional heat treatment equipment to produce, so that we can control the construction process by ourselves. In China,We are the only company that does the heat treatment by ourselves and the heat treatment of screw elements made by Nanjing factory is processed by outsiders, so the quality of products can not only be completely guarantee.
Packaging details:
Packing Details : Foam cotton,wooden case
Port: Shenzhen
Workshop
FAQQ: Are you trading company or manufacturer ?
A: We are factory.
Q: Where is your factory located? How can I visit there?
A: Our factory is located in Chengdu, Sichuan Province, China, 1) You can fly to
Chengdu Airport directly. We will pick you up when you arrive in the airport; All our clients,
from domestic or abroad, are warmly welcome to visit us
Q: What makes you different with others?
A: 1) Our Excellent Service For a quick, no hassle quote just send email to us We
promise to reply with a price within 24 hours - sometimes even within the hour. If you
need an advice, just call our export office , we will answer your
questions immediately. 2) Our quick manufacturing time For Normal orders, we will
promise to produce within 30 working days. As a manufacturer, we can ensure the delivery time according to the formal contract.
Q: What is your terms of payment ?
A: 1) T/T payment; 2) LC;