Custom Made Aluminum CNC Machine Machining Forge Metal Parts

Min.Order: 1,000
Product origin: Dongguan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 3.8 ~ 5.5

Description
Forging Part Description:
 
Carbon Steel Forging
1020 Steel, 1035 Steel,1045 Steel, A105, Q235, Q345, 20CrMnTi,ect
Alloy Steel Forging
20Cr, 20CrMo, 30CrMo, 35CrMo, 42CrMo,ect
Stainless Steel Forging
1.4301, 1.4401, 1.4571, AISI 304, AISI 304L, AISI 316, AISI 316L, AISI 316Ti, etc.
Forging Weight
0.1-50 Kg
Forging Diameter Range
5mm - 600mm
Forging Tolerance
DIN 7526
Forging Surface Roughness
Ra 6.3
Machining Tolerance
0.01mm
Heat Treatment
Solution, Annealing, Quenching, Tempering, Aging, etc.
Surface Treatment
Pickling, Passivation, Sand-blasting, Shot-blasting, Electro-polishing, Buffing, Mirror-polishing, Galvanization, Zinc-plating,
Nickle-plating, Chrome-plating, Anodization, Coat in g, Painting, Black phosphating, Electrophoresis, etc.
Special Inspection
Leakage test, Shell Strength test, Radiographic test, Ultrasonic test, Magnetic test, Liquid penetration test, Salt spray test,
etc.
Quality Documents
Measuring report, EN 10204 3.1 material certificate, PPAP, APQP, FMEA, etc



About us:


 

Dongguan Kebao Precision hardware  Co.,Ltd is a professional closed die forging manufacturer & exporter. We specializes in producing all kinds of forging components involved in mining machinery, construction machinery, automotive components, oil & gas industry, etc. Our forgings range from 0.05kg to 100kg

Our Product 

 




F A Q:
Q1: How to send cases to work with us?
A1: You only need to prepare your cases and write down the instructions on the lab sheet  and then call DHL or UPS or FedEx to come to pick up your cases, they will deliver the cases in 3 working days. Also you can send us digital scan files by email via WeTransfer, or connect with our 3Shape account or CS account or Itero account.

Q2: How can I get the samples?

A2: We can provide you free sample for our existing products, the lead time is around 3-4 days. You need to pay for the sample delivery cost.

Q3: What is your MOQ? 
A3:  MOQ is 100


Q4: What is your manufacture lead time for our order?
A4: Our normal leading time is 7-8 days. If you have urgent request, please just let us know. We will try our best to shorten the leading time to meet your requirements.

Q5: How can I release the payment to you?
A5: We can receive your payment by T/T , Paypal, Western union.
Product Tag:
Related categories:
Scroll to Top