Skid Steer Asphalt Milling Machine

Min.Order: 1
Product origin: Xuzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 9500 ~ 11000

Description
                         
Best price China New Brand Cold Planer for Skidsteer Loader

Product Description


Applications:

  1. Road maintenance
  2. Removing asphalt surfaces prior to overlay
  3. Widening road shoulders
  4. Repairing potholes and drainage lines
  5. Mixing stabilizing agents into base for a more durable repair
  6. Convenient for planing frost heaves, expansion joints, and removing lane markings


 

Product Parameters

ModelS204 24
Dimension(L*W*H)(mm)1175x1626x1032
Max cutting depth(mm)150
Cutting width(mm)600
Working flow(L/min)110-180
Cutting Blades ( pcs)68
Working pressure(mpa)20
Suitable roadAsphalt
 

Features:
1.Carbide teeth make efficiently rip through asphalt surfaces
2.Easy access tooth replacement
3.Independent pivoting head for better contour tracking
4.Efficient piston drive motor provides high torque
5.Convenient,in-cab electro-hydraulic control for depth and sideshift
6.High drum weight makes less vibration
7.Strong shields protection for hydraulic and electrical components
8.Hinged cover makes pick maintenance access easy
9.High rear spoil clearance to prevent recirculation of material

 

Detailed Photos

Applications

 

Relative Products

Delivery

Company Profile



FAQ
Are you factory or trading company?
A) We are ISO9001 certified factory, mainly manufacture in Construction Machinery & Attachments.
B) Using "Self-produced Self-marketing" business, reducing the cost of intermediate links.
What's your company advantages?
A) As the leading manufacturer of construction machines, we have own proffessional design team, we can OEM products according to customer needs.
B) With us your money and your business is safe. We can offer 7-days refund in case of bad quality,
C) Coming together is a beginning; keeping together is progress; working together is success.
Can we buy one sample?
Yes, we need to add sample fee to the price and will return it back to your after receiving your large order in future.
What's your delivery time?
After receiving your payment, we start to produce your order. It usually takes about 15-45 days depending on the products you order.
How do you control your quality?
To guarantee high quality and efficient management, we have passed ISO9001 quality management system certificate. All of our products are 100% inspected before shipment. Our whole manufacturing processes are under a very serious and strict system in our company.






 
Product Tag:
Related categories:
Scroll to Top