Tools High Smoothness Straight Handle Chamfer Inner Coolant Drill Bits Tools

Min.Order: 1
Product origin: Changzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 5 ~ 40

Description

Tools High Smoothness Straight Handle Chamfer Inner Coolant Drill Bits

Product Description

 


DESCRIPTION
1. Anti-broken Heat Resistance And Impact Resistance: Made by ultra micro-grain raw material imported from Germany, improve heat resistance and impact resistance
2. Chipping Removal Effect: Slot with big capacity, efficient chipping removal in high-speed cutting
3. Improve Quality Of Surface: Special design of cutting edge, decreasing of resistance


SPECIFICATION

ITEMSPECIFICATIONDIAMETERTOTAL LENGTHFLUTE LENGTHShank Length
D2103-LH-3DD3-D3.76622036
D2103-LH-3DD4-D4.76662436
D2103-LH-3DD4.8-D66662836
D2103-LH-3DD6.1-D78793436
D2103-LH-3DD7.1-D88794136
D2103-LH-3DD8.1-D1010894740
D2103-LH-3DD10.3-D12121025545
D2103-LH-3DD12.1-D14141076045
D2103-LH-3DD14.1-D16161156545
D2103-LH-3DD16.1-D18181237350
D2103-LH-3DD18.1-D20201317950
D2103-LH-5DD3-D3.76662836
D2103-LH-5DD4-D4.76743636
D2103-LH-5DD4.8-D66824436
D2103-LH-5DD6.1-D88915336
D2103-LH-5DD8.1-D10101036140
D2103-LH-5DD10.3-D12121187145
D2103-LH-5DD12.1-D14141247748
D2103-LH-5DD14.1-D16161338348
D2103-LH-5DD16.1-D18181439348
D2103-LH-5DD18.1-D202015310150


1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.

 

2) How can I get a sample to check your quality?

After price confirmation, you can require samples to check our quality.

3) How long can I expect to get the sample?

After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays. You can use your own express account or prepay us if you do not have an account.

 

4) How long does the whole procedure being worked out?

After you place an order, the production handling time is about 20 days. We need 5 days to prepare all the stuff then 15 days for manufacturing.

 

5) What about the transportation and delivery date?

Normally we use shipment to transport the goods. It is about 25-40 days. It also depends on which country and port you are in. It could be shorter if you need to send the goods like Asian. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

 

6) Are you a trading company or manufacturer?

We are a professional manufacturer. 

 

7) Where is your factory located?

We are located in  Xixiashu Town, New North District, Changzhou City, Jiangsu, China.

 

 

8) How about your stock?

We have large quantity products in stock, regular types and sizes are all in stock.

 

9) Is free shipping possible?

We don't offer a free shipping service. We can have a discount if you buy a large number of products.






 

Product Tag:
Related categories:
Scroll to Top