China Supplier Construction Building Hardware with Stainless Steel

Min.Order: 500
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 1.8 ~ 2.5

Description


Product Description

    R&D
Softward: Solidworks, CAD,  Procast,  UG
Development cycle of samples: 25-35 days
Materials
Stainless steel: 304/304L, 316/316L, 410/416 etc
Duplex stainless steel: 2250, 2507, Zeron 100 etc
Carbon steel
Alloy steel
Technical Parameter
Part weight: 2g to 30kgs
Max dimension : 600mm for diameter or length
Min wall thickness : 1.5mm
Casting roughness: Ra3.2-6.4       Machining roughness: Ra1.6
Tolerance of casting: CT6
Inner core: ceramic core, urea core, water soluble wax core.
Heat treatment
Normalzing, Tempering, Quenching, Annealing,  Quenching & Tempering, Caburization,    Solution treatment.
Surface treatment
Polishing, bead blasting, zinc plating, hot dip galvanized, nickel plating, passivation,         
Electro-polising, mirror polishing, Brush polishing,  PE coating, Powder coating, etc
Inspection
Cleanliness inspection, X-Ray radiographic inspection, MIM inspection
Production capacity
More than 120 tons per month
Quality Certificates
ISO9001:2015
IATF 16949.





Investment Casting Process (Lost Wax Casting)



 
Secondary Operations and Treatment of Investment Castings We offer:


1.Surface Treatment: Sand Blasting,Polishing, Powder Coating, Painting,Brushed electropolishing,Chrome/Zinc Plating...
2. Machining: Broaching, milling, drilling, tapping, Laser Cutting...etc
3. Heat treatment :Annealing, tempering, Quenching, normalizing




QC Inspection

We have the chemical elements analysis centre and the mechanical testing centre which include the following quality control measures:
Spectrographic analysis, magnaflux crack detection, ultrasonic detection, dynamic fatigue testing, hardness testing, proof and ultimate breaking strength test... TUV DIN EN ISO 9001: 2000 & ISO/TS16949 available

In order to ensure the quality of the orders,
our independent QC members to carry out strict inspection at each stage:
(1)Incoming material inspection
(2)Inspection of work-in-progress
(3)Finished product inspection
(4)Random warehouse inspections
 
(MIM Inspection)



Packing and Delivery

Any requirement on packing, please feel free to let us know

                     
Packing instruction

Product Tag:
Related categories:
Scroll to Top