1300mm/1600mm Automatic Tape Coating Machine PVC Insulating Tape Production Line

Min.Order: 1
Product origin: Changzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 100000 ~ 400000

Description
1300mm/1600mm Automatic Tape Coating Machine PVC Insulating Tape Production Line


Descripition:
This Machine used to produce PVC insulation tape Log rolls.The main structures are unwinder , coater, drying ovens, cooling roller unit, rewinder, frame, duct, electrical system.

 

Features:
1. Different coating methods feasible to suit different processes like water base and solvent base glue,
the coating weight can be precisely controlled.
2. Multi-section low tension controls the running of film, can minimize the contractibility of film.
3. Suitable for drying system of different heating sources, the temperature of oven
can be segmental controlled precisely. 
4. EPC device automatically corrects the deviation of film edge, can guarantee the edge neat
when coating and rewinding.
5. Surface rewinding method for rewinder, equip with film accumulator, can splice film and rewind set length
without stopping machine, high production efficiency.


 

Technical parameters:

ModelUW30-11UW30-13UW30-16
Effective Width (mm)110013001600
Oven Length (m)36(Depends on production process)
Mechanical Speed (m/min)4-40
Heating MethodSteam/thermal oil/ hot wind stove/electricity


Application:
Suitable for producing of PVC electrical insulating tape.


Company Information:



FAQ:

1. Are you trading company or manufacturer?
We are manufacturer, and also provide the business solution to all the friends.

2.  What's payment terms you accept?
The buyer make the 30% deposite,the 70% balance will be paid by TT within 7 days before delivery or the buyer open 100% irrevocable L/C at sight as the appointed bank of the seller.

3. What's the delivery time?
The seller will arrange shipment within 90working days once confirm the order.

4. How to install and debug the machine after arrival?
We will provide instructions and installation videos. If the Buyer needs engineers to install in the local area, the buyer should pay USD150  per day for subsidy of engineers and afford the charge of daliy life(including the daliy meal ,traffic and hotel) in the locus of buyer and return tickets from China to User's factory.

5. Does it easy to operate and what can i do if it doesn't work?
First ,our machine is stable and easy to operate by one man ,what you do is just learn some basic thing. And we will sent you manual and video ,we suggest you to come to visit our factory to learn more thing by yourself , and if there is something goes wrong , you can call us ,video-chat ,email us . And we will give solutions within 36 hrs .Our engineer also can be distributed to overseas as you required.

6. How long is your machine's warranty period?
Seller warrants the products for 13 months from the B/L date.

Product Tag:
Related categories:
Scroll to Top