Model NO. | INVOTIVE-1685 |
Name | Crystal Storage Rack Silicone Coasters Resin Mold Ornaments Gifts Promotion Products |
Material | Silicone |
Specification | 11.8*11.8*1.2cm/40g |
Shape | Big round, small round, oval
|
Color | White |
Transport Package | Polybag, Color Box, Customized Is Acceptable |
Trademark | Invotive |
HS Code | 3924100000 |
Origin | Guangdong, China |
Production Capacity | 1000PCS/Day |
Company Name: Dongguan Invotive Plastic Products Factory
Product Name:Crystal Storage Rack Silicone Coasters Resin Mold Ornaments Gifts Promotion Products
Material: 100% food grade silicone,eco-friendly,non-toxic,durable in use
Color/Size/Shape: Customizedcolor/size is available for our engineers to design
Packing Details: Customized,usually color card,color/PET box,then polybag and carton
Price: Factory price
OEM/ODM Service: Available
Origin: Guangdong,China(Mainland)
Logo & Mold tooling
1) Logo: Embossed,Debossed ,Printing
2) Mold tooling time: about 15 days
3) Mold tooling cost: Based on the final design
Sample
1) Existing samples lead time: 2~5 days
2) Customized samples lead time:about 7~15 days
Payment & Shipping Terms
1) Packing Details: 80 PCS/master carton;
2) Port: Shenzhen
3) Payment terms : L/C; T/T(30% deposit, 70% before shipment)
4) Shipping terms: EXW,FOB, CIF, CNF
5) Lead time: 15~25 days
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. we will provide you sample for free, as long as you afford the express freight.
3) How long can I expect to get the sample?
After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays.
You can use your own express account or prepay us if you do not have an account.
4) How long does the whole procedure being worked out?
After you place a order,the production handling time is about 15-30 days.
We need 5 days to prepare all the stuff then 10-25 days for manufacturing.
5)What about the transportation and delivery date for the heart cake mould order ?
Normally we use sea shipment to transprot the goods.It is about 15-40 days.It also denpends on which coutry and port you are.It could be shorter if you need to send the goods like Asian.
If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.