Plastic Mold Factory Professional Mould Suppliers Custom OEM ODM ABS PP PE PS PA PC TPU Hot/Cold Runner Over Mould Injection Mold
The capabilities of the factory | |||||
Main services | 3D /2D design, Prototypes, Mold design, Mold making, Mold testing, | ||||
Low volume/ High volume plastic injection production | |||||
Production process | Detailed content | Cycle of time | |||
Design Software | UG, Pro E Solidwork, AutoCAD, Moldflow ... | ||||
Product design | According to customer requirements, product design, or customer design concept, we complete the product design | Product design typically takes between 3 and 8 days. | |||
Sample verification: | 3D printing CNC | 2-15 days | |||
Mold analysis and Product analysis | DFM Mode flow analysis | 2-7 days | |||
Mold design | √ Design review | 2-7 days | |||
The material of Mold | H13, 738H, √ 2738, NAK80, S136, etc | 3-7 days | |||
Mold base | LKM Futaba HASCO ,DME | 7-15 days | |||
Machining and Dimensional measurement | Deep hole drill | 1-3 days | |||
Medium wire cutting √ Slow wire cutting | 1-4 days | ||||
cnc | 1-5 days | ||||
Electric spark | 1-3 days | ||||
simi fited | 3-13 days | ||||
polishing | 1-3 days | ||||
Surface etching | 1-7 days | ||||
Die trial production | Supplier's responsibility | 1-3 days | |||
Dimensional measurement and Trial assembly | Two-dimensional and coordinate measuring instrument | 1-3 days | |||
Time of mold completion | According to the complexity of the mold, the customer's delivery requirements to determine the mold completion time | ||||
Plastic production | plastic Injection Machine: 128T 168T 208T 320T | According to the complexity of the mold, the customer's delivery requirements to determine the mold completion time. Generally, the completion time is 30-60 days |
Our team utilizes the most current and sophisticated technology and equipment in the mold making process, create world class tooling
at competitive prices with short lead time.
-CAD/CAM/UG Software
-Mold Flow Analysis
-Mirror EDM Machines
-Precision CNC Machines
-Milling and Drilling Machines
-Grinders
-Engraving/Texture
Mould Trade Process
1. Quote | According to sample, drawing and specific requirement. |
2. Discussion | Mold material, cavity number, price, runner, payment, etc. |
3. S/C Signature | Approval for all the items |
4. Advance | Pay 50% by T/T |
5. Product Design Checking | We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report. |
6. Mould Design | We make mould design on the basis of confirmed product design, and send to customer for confirmation. |
7. Mold Tooling | We start to make mold after mold design confirmed |
8. Mold Processing | Send report to customer once each week |
9. Mold Testing | Send trial samples and try-out report to customer for confirmation |
10. Mold Modification | According to customer's feedback |
11. Balance settlement | 50% by T/T after the customer approved the trial sample and mould quality. |
12. Delivery | Delivery by sea or air. The forwarder can be designated by your side. |
A) Before Sales Service
B) Production Period Service
C) After Sales Service