Material | Fresh PVC |
Size | Cr80 85*54mm or customized |
Thickness | 0.76mm-0.86mm or customized |
Frequency | 125khz / 13.56Mhz/ 860-960Mhz |
chip | LF:TK4100, EM4200, EM4305, T5577, Hitag HF: NTAG213 / 215 / 216/FM11R08/NXP Ultralight/ Mifare classic 1k s50/Mifare 4k/ ICODE SLIX UHF:AlienH3 serias, Monza serias, Ucode EPC G2 serias |
Protocol | ISO7815/ ISO14443A/B/ ISO 15693/ ISO 18000-6B/6C |
Memory | 1K Bytes/512 bit/4k Bytes |
Printing | 4 color offset CMYK Printing/Pantone color printing/Silk screen printing/ Digital printing |
Craft | Glossy/Matt/Frosted |
Others artwork | a.Glitter gold/silver background b.Loco 300oe/600oe magstripe , Hico 2750oe/4000oe magstripe c.Signature Panel d.UV spot logo e.thermal/DOD/Inkjet printing serial/UID numbers f.thermal/DOD/Inkjet printing EAN13/128/39 barcode g.Laser engraving serial/UID number (brown/grey) h.Embossing serial number(gold/silver) i.Signature Panel j.Encoding and Encryption |
Atenna Material | Cooper wire |
Sample | Available |
Lead time | 7-10 Work days |
Application | Access Control, Time attendance, Hotel key card, transportation, Library and Campus, Parking lot system, Consuming system, Identity, Access Control, Inventory and Logistics Supply Management, Item Identification, Traceability, Transportation ect |
Certification | SGS/ROHS/CE/ISO/CE RED |
Question 1: How to place an order?
A: The procedure is like this:
1). Contact customer service to determine the specification and product model, quantity and other detailed information (you can also arrange freight forwarding by yourself);
2). We provide you with a proforma invoice according to your final decision, which contains all product details;
3). You need to arrange 50% of the payment to our bank account, and then we will prepare the product to start production (the cycle is generally about 10 days, which can be shipped specifically for your order configuration quantity);
4). After the product is completed, the remaining payment is paid, and we arrange forwarder delivery (or we provide relevant information to arrange forwarder transportation by ourselves).
5). After completing this process, the customer service will track the product location and notify you when it is about to arrive and when it arrives, so that you can quickly prepare for customs clearance and other related issues.
6). After getting the items, there will be a dedicated after-sales team waiting for your follow-up feedback.
Q2. What is your production/delivery time?
A: The production/delivery time will be controlled within 20 days (generally, it can be shipped in 10 days and simple configuration is 2-3 days).
Q3. Do you test all items before shipping?
A: Yes, we have passed 100% testing before shipment (basic equipment testing also includes roads, climbing, raining, over-water roads, etc.).
Q4. Do you support sample shipment?
A: Yes, we support shipping samples to the port
Why choose us?
1. Complete certificate
2. Perform 100% QC inspection before leaving the factory
3.100% tracking the progress of product orders and feedback
4. Real-time tracking of customers to ensure that orders are produced in strict accordance with customer plans
5. Complete development and supply chain to provide follow-up quality assurance.