Material: | ADC-12 |
Cavity Number: | 1 |
Process Technology: | High pressure die casting |
Product Dimensions: | Customized |
Casting General Tolerance: | Grade GB-CT4 |
Surface Finish: | Polishing, Vibratory deburring,Anodizing, Power Coating, Painting,etc |
Flow Processes: | Die casting, Trimming, Polishing, vibratory deburring, Machining, Cleaning,Packing, Shipping |
Control Measure: | Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control |
Inspection Equipment: | CMM, Caliper, Plug Gage,Spectrograph,Pneumatic measuring tool,etc |
Application: | LED Lighting Accessories Furniture Accessories Electronic & Electric Accessories Auto & Motorcycle Accessories Machinery Accessories Public Facilities |
Certificate: | ISO/TS16949:2009 |
Lead Time | 30-35 days |
Trade Term: | FOB Ningbo |
BOLANG, established in 2001, specializes in manufacturing aluminum & zinc alloy die castings, serving automotive components, agricultural machinery parts, construction components, lighting accessories, and various precision machined parts industries.
The company possesses a highly qualified staff team. Technical engineers are with decades' experience in die-casting techniques such as vacuum casting and squeezing pin technology.
In order to establish a steady production system, the company possesses die-casting equipment ranging from 280 tons to 1200 tons. To meet the quality control standards, the company is equipped with CMM, spectrometer, image measuring instrument, blue light scanner, magnifier, digital layer thickness gauge, leak tester, hardness tester, roughness tester, and electron microscope. The company also awarded certificate as IATF16949, ISO14001, ISO45001, etc.
In order for US clients to reduce 25%-35% import tariff and save the cost, we set up a Malaysia branch factory - RONGKUN METAL PRODUCTS SDN BHD. We plan to equip 3 die casting machines (280T, 400T, 630T) and 5 CNC, also CMM and other measurement equipment as well in the beginning. We will manage to get the certificate of IATF16949, ISO14001 for this branch factory in 2024.
FAQ |
Q1. When can I get the price? |
A: We usually quote within 2-3 days after we receive the RFQ or feedback within 2 days if any questions on prints need to be confirmed. |
Q2. How long is the lead-time for mold? |
A: Usually it depends on the size and complexity of the mold. But normally, the lead time is 35-45days. |
Q3. I have no 3D drawing, how should I start the new project? |
A: You can supply us a sample, we will help work on establishing 3D model accordingly. |
Q4. Before shipment, how to ensure the products quality? |
A: We have strict development procedure, during samples development, we have capacity to produce according to PPA, after PSW approved, |