Auto Spare Part Other Vehicle Parts Auto Engine Part Auto Suspension Systems.

Min.Order: 100
Product origin: Ningbo, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 1.6 ~ 2

Description

 

Product Description

 

Shock absorber components


    In the shock absorber of automobile and motorcycle, piston rod and piston guide valve are important parts. Considering the stable damping force of the shock absorber, the use of powder metallurgy parts, with a high precision sheet surface, can reduce friction, ensure the stability of handling, improve ride comfort.

Detailed Photos

Process Characteristics

1, the product density is controllable, such as porous materials, good density materials, etc.;

2, fine grain, uniform microstructure, no component segregation;

3, near forming, raw material utilization rate >95%;

4, less no cutting, cutting processing only 40~50%;

5, the material component is controllable, conducive to the preparation of composite materials;

6, preparation of insoluble metal, ceramic materials and nuclear materials.

 

Main Application

  The application range of powder metallurgy products is very wide, from common machinery manufacturing to precision instruments; From hardware tools to large machinery; From the electronics industry to motor manufacturing; From civil industry to industry; From the general technology to the cutting-edge high technology, can see the powder metallurgy process figure.
 

Packaging & Shipping

Packaging Detail: Iron pallet or wooden cases
Delivery Detail: By sea or By air

1. Waterproof packing with the international export standard by 20ft, 40ftcontainer.Wooden Case or Iron Pallet.
2. The whole set of machines size are large as normal, so we will use Waterproof materials to packall of them. The motor, gear box or other easily damaged parts, we will put them into box.

Company Profile

FAQ

1. What's the MOQ? 
MOQ is 1 sets.

2. What's the after sales?
Our products' warranty is for 12 months. after that, we can still supply thel spare parts.

3. What's your lead time?
Usually within 20 work days.

4. Are you interested in dealership with local company?
Yes, we are quite interested in this business. We'd like to cooperate with some local partner to sell more machines in local market and supply better service.

5. What's your Payment terms?
30% payment in advance by TT, 70% balance before delivery.

Related Products

Product Tag:
Related categories:
Scroll to Top