Our PE Film Shrink Wrapping Packing machine is used in the combination package of mineral water, beverage, beer, liquid, infusion bottle and so on.
The linear bottle feeding method has small space occupation, convenient layout, stable conveying and high efficiency; the sealing adopts the advanced structure of heat sealing and eagerness, the sealing is firm, the edges are neat, the stitching performance is good, and there is no flash.
Model | WD-150 |
Overall Dimensions L*W*H(mm) | 5050*3300*2100 |
Weight of Machine(kg) | 1200 |
Heat Shrinkable Furnace Size(mm) | 3700*920*1750 |
Maxmum Size L*W*H(mm) | 600*400*350 |
Packing Speed(b/m) | 8-10 |
Width of Conveyer Belt(mm) | 920(can be adjusted to 200) |
Working Power | 380V 20kw |
Woring Pressure(Mpa) | 0.6-0.8 |
Machine Power(kw) | 20 |
1)Design of medium speed packaging for bottled drinks (pure water, beverage, fruit juice, daily products).
2)In the process of product delivery, automatic packaging, save time, improve efficiency.
3)Programmable control PLC control, automatic workflow.
4)Constant temperature sealing cutter, Tefloning surface, smooth incision, firm.
5)Touch screen operation, user-friendly interface, user-friendly control.
6)No bottom packaging, suitable for different sizes and different packaging.
7)Medium speed heat shrinkable packaging machine in the field of preferred models, simple and convenient operation, simple maintenance.
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory.
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.