Servo Energy Saving Injection Molding Machine for High Quality Plastic Product
- Imported advanced computer systems, Chinese / English interface.
- Can save 50 sets of mold parameters.
- Advanced clamping structure and injection parts, precision hydraulic system and circuit design.
- Suitable for producing different types of precision small parts.
- A variety of text can be switched.
- Manual, semi-automatic and fully automatic mode.
- Automatic movement monitoring with alarm and fault diagnosis.
- Function of slope setting can set the start and stop of movements, so as ensure the smooth movement.
- Quality:12 month Quality guarantee ,Free spare parts replacement,(NOT include man-made sabotage)
- Service:We provide free advanced training and maintenance in china factory,and 24 hours on-line or phone service if you request we also can provide installation and training abroad,until customer's satisfaction
- Delivery time:35days after advance payment
Parameter | |||
Model | Unit | BST-2300A | |
INJECTION UNIT | A | B | |
Screw Diameter | mm | 50 | 52 |
Shot Size(Theoretical) | cm³ | 608 | 658 |
Shot Weight | g | 546 | 592 |
Injection Pressure | Mpa | 184 | 170 |
Injection Rate | g/s | 160 | 176 |
Screw L/D Ratio | L/D | 22.8 | 21.9 |
Screw Speed | r.p.m | 0-180 | |
Nozzle Diameter | Srmm | 10 | |
CLAMPING UNIT | |||
Clamp Tonnage | KN | 2300 | |
Toggle Stroke | mm | 480 | |
Mould Thickness | mm | 200-510 | |
Space Between Tie-bars | mm | 510X510 | |
Ejector Stroke | mm | 155 | |
Ejector Tonnage | KN | 70 | |
Ejector Number | Piece | 9 | |
Hole Diameter | mm | 160 | |
OTHERS | |||
Heat Power | KW | 11.6 | |
Max. Pump Pressure | MPa | 16 | |
Pump Motor Power | KW | 18.5 | |
Valve Size | mm | 16 | |
Machine Dimension | m | 5.7X1.8X2.0 | |
Machine Weight | t | 6.5 | |
Oil Tank Capacity | L | 300 |
Plastic Injection Moulding Machine
Our Services
Supply mode: the supplier factory delivery, simple packaging, the supplier agent consignments, the expense is payed by the buyer .
Terms of payment: the buyer pay 30% of the total payment as the signing of the deposit, the contract comes into effect, pay the balance before shipment .
Quality assurance: the equipment according to the enterprise standard implementation and mechanical guarantee period is one year, the main electrical appliances for half a year .
Method of acceptance: equipment processing after the completion of delivery, the buyer sent to the factory acceptance, for commissioning, the buyer to provide raw materials for plastic material .
Technical and after-sales service:
The supplier the following technical and after-sales service commitment
A) provide on-site installation guide;
B) responsible for the commissioning of equipment;
C) responsible for the buyer's personnel mount guard before the operation and maintenance training;
D) one year free warranty (due to the buyer's improper operation caused by damage charge costs), and ensure the supply of spare parts for a long time, only receive the cost.
E) provide technical advisory services for a long time
Delivery date: the contract is signed and completed within 45 working days after receiving the deposit unit processing and manufacturing, with the conditions of the factory acceptance