Screw Compressor Wholesale/Supplier Refrigeration Chilling Equipment 20~100 HP of Industrial Air Cooled

Min.Order: 1
Product origin: Wuhan, Hubei, China
Infringement complaint: complaintComplaint
US$ 2000 ~ 12000

Description

Hot Selling Screw Compressor Wholesale Refrigeration Chilling Equipment 20~100 HP Industrial Air Cooled Water Chiller 

About US

 


We are a manufacturer, we can customize products for you according to your requirements.If you don't know which model is suitable for you, you could send message to us.We have several professional engineers to make a customized solution for you.
Product Description

 
Open Type Medium And low Temperature Air-Cooled Condensing Unit   
Model of unitsRX-BZ-RX-BZ-RX-BZ-RX-BZ-RX-BZ-RX-BZ-RX-BZ-RX-BZ-RX-BZ-
003L004L005L007L009L012L014L018L023L
Compressor model4FES-34ES-44DES-54VES-74TES-94PES-124NES-144HES-184GE-23
Applicable Temperature(ºC)-20ºC ~ -35ºC
RefrigerantR404A
CondenserQuantity of Fan(pcs)222244444
Power of Fan (w)2*1352*1902*1902*1904*1354*1904*1904*1904*250
Ref.CapacityEvaporatingRef.46405890703082401028011320139501988023400
 of TemperatureCapacity (w)
condensing units-25ºCPower (w)30603840455050806350688085801200014270
 EvaporatingRef.359045405420614077608410105201532015320
 TemperatureCapacity (w)
 -30ºCPower (w)26603320394042605380574072401035010350
CouplingTube coupling121212161616161622
Suction coupling222828283535354254
Overall Lenght (A) mm94010001000101011701170117012001340
dimensionWidth(B) mm820820820820900900900900900
 Height (H) mm54059059069010201120112013201420
Installation dimension(D*E)mm590*786644*786644*786644*786800*860800*860800/860830*8609
50*860

 

Compressor recommended (Copeland, Sanyo and others optional)
Advantages:

1. Special valve design, high efficiency, stability and long service life. 2. Large cooling capacity, energy efficiency ratio (COP value) 20% higher than other brands of compressors.
3. Good low-temperature performance. For R22 refrigerant, the evaporation temperature of a single-stage compressor can reach -40°C.
4. Used in a variety of refrigerants (R12, R22, R502, R134a, R404A, R507), meeting environmental protection requirements.
5. Use separate coil starting to reduce the starting current and reduce the impact on the power grid.
6. Wide range of applications: compressors are divided into medium-high temperature type and low-temperature type. The evaporation temperature of the high-temperature type can reach 12.5ºC, the evaporation temperature of the low-temperature single-stage compressor can reach (R22)-40ºC, and the evaporation temperature of the two-stage compressor can reach (R22)-40ºC. The evaporation temperature can reach (R22) -50ºC. If R404a or R507 is used, the evaporation temperature will be lower, reaching -70°C.
7. Wide range of energy adjustment: 4-cylinder compressor energy adjustment range is 50%, 100%, 6-cylinder compressor energy adjustment range is 33%, 66%, 100%. When the load of the refrigeration system changes, effective adjustments are made to reduce operating costs.
8. The built-in motor overload protector (INT69VS) effectively protects the motor from overload and overheating due to increased load on the refrigeration system or insufficient refrigerant return air volume in the refrigeration system.
9. In order to prevent the starting current from being too large, customers can also choose an unloading starting device.
10. In order to reduce the exhaust temperature, users can choose a water-cooled cylinder head. For offshore use, a seawater-proof cylinder head can be used, with an additional fan or electronic liquid injection device (CIC system).
 
Our Factory

Our Cases

Applications



1. Who are we?
We are based in Hubei, China, starting from 2003, specializing in refrigeration industry for  20 years, and staff in our company is more than 100, meanwhile, our footprints are all over China, playing more and more important role in international market.

2.What can you buy from us?
 Refrigeration Compressors, Condensing Units, Refrigeration Equipment, thermal insulation Sandwich Panels and other Parts, also, we provide turn-key solutions and products according to your needs.

3. Why choose us?
We can list the advantages and disadvantages of different solutions (Construction Cost, Running Cost, Maintenance Cost and etc ), which may help you make a decision.

4. How can we guarantee quality?
All parts have gone through strict test before assembly in batch, and the finished goods will go through quality test before packing and shipping, also we provide after-services both online and local technical instruction if necessary.

5. What is your standard delivery time and shipping port?
 It usually takes 10~20 working days for standard parts. And for customized products, it may take 20~30 working days. Departing from ShangHai, Tianjin and other Ports.
Product Tag:
Related categories:
Scroll to Top