260ml Gasoline Hengyue Carton CE IAF EMC EU-II Electric Chain Saws Garden Tool

Min.Order: 1
Product origin: Jinhua, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 1 ~ 150

Description

Displacement

43cc

Rated Output Power

1.45kw

Relent Speed

8000rpm

Fuel Mixture Ratio

25:1

Fuel Tank Capacity

550ml

Engine Oil Tank Capacity

260ml

Guide Bar Size

18'' to 24''

Chain Pitch

0.325''/3/8

Chain Gauge

0.058''

N/G Weight

6.5/7.8kg

Meas

48*26*30

20'/40'/40'HQ

780/1680/1820

Certification

CE

Character of using technology

1.When you are cutting firewood, pruning limbs, or taking down a whole tree, chainsaw is the most helpful  tool.
2.Great chainsaw that starts easy and fast, runs smoothly and effectively, provides years of dependable performance and leads long and trouble-free life.
3.Great chain saw provides 2-stroke engine and a easy starting ignition system that ensure fast starts and smooth operation.

More Information
 
1.When can I get the quotation?
A: We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us in your email so that we will regard your inquiry priority.

2. How can I get a sample to check your quality?
A: After price confirmation, you can require for samples to check our quality.
  If you need the samples, we will charge for the sample cost. But the sample cost can be refundable after you place an order in the future.

3. Can I add my logo on the carton and stickers?
A: Yes, we can do OEM service, but you need send your carton & sticker design to us.

4. What is your MOQ?
A: Normally, we do not have MQR. If you need do OEM, the MOQ is 500 pcs.

5. What kind of files do you accept for printing?
A: PDF, PSD, EPS, Core Draw, high resolution JPG.

6. How long can I expect to get the sample?
A: After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 2-5 days.

7. What about the lead time for mass production?
A: Honestly, it depends on the order quantity and the season you place the order. The lead time of MOQ is about 15 to 20 days.

8. What is your term of payment?
A: By T/T, 30% at first, 70% after loading or see the copy of bill of loading.

9. What are the terms of delivery?
A: We accept EXW, FOB, CIF, etc. You can choose the one which is the most convenient or cost effective for you.
Product Tag:
Related categories:
Scroll to Top