Multilayer PCB Electronic Copper Clad Laminated Circuit Board Copper Base PCB Manufacture

Min.Order: 1
Product origin: Shenzhen, Guangdong, China
Infringement complaint: complaintComplaint
US$ 1 ~ 10

Description
Company Profile

Shenzhen ZINPON Electronics Co., Ltd

One-Stop Services Of Custom PCB Manufacturing,PCB Assembly and Electronic Components Sourcing 


PCB Manufacture
From prototype circuit boards to massproduction,from fast turn to stardard deliverytime, ZINPON is your reliable PCB manufactuer,what's more, each process from material incoming, drilling, etching, copper plating.soldermask, silkscreen, surface finished,CNC,E-testing to FQC are in house, which is very strictly under our control.

Our Advantages

 




PCB Assembly
Electronic PCB assembly is the process of populating or stuffing printed circuit boards(PCBs) with electronic surface mount and/or through-hole components to form afunctional printed circuit board assembly (PCBA).The PCB main function is to mechanically supportand electrically connect the electroniccomponents. ZINPON is your best partner.

Electronic Components Sourcing
ZINPON has its own components warehouse and has built one platform with the reach, flexibility,and support services,our custom supply chain optimization solution positions you to solve electronic component sourcing and obsolescence problems in the short term and the future.

18 years experience
Accept Stardard: IPC Ill, Defence, Automotive,Medcial, We offer you expanded PCB capabilities: Rigid PCB, Flexible, Rigid-flex, HDI board
Up to 50 layer prototype PCB
ZINPON Manufacture PCB board up to 50 Layer, Raw material: Fr4, Rogers, Arlon,Panasonic,Taconic, Nelco, Isola, Ceramic, Metal core
Up to 28 layer mass production
Support PCB surface process: HASL-LF, ENIG ,Plating gold, Immersion tin, Immersion silver,ENIPIG, OSP

Fast Response services
LayersQTAMass production
2 Layers24 Hours10 days
4 Layers48 Hours12 days
6 Layers48 Hours14 days
8 Layers72 Hours15 days
10 Layers96 Hours18 days
12 Layers120 Hours18 days
14 Layers120 Hours20 days
Above 16 LayersDepends on the specific requirments
Note:
-Above lead time base on EQ clearly and materail available.
-Above lead time base on general techologies.Specail requirments will need extended days.
 

 

           

 

Product Tag:
Related categories:
Scroll to Top