Frequency conversion water tank wire drawing machine 2.0-0.4mm
Product Description
1. Simple structure, low cost, easy to operate, high productivity
2. Suitable for drawing a variety of steel wire.
Low-carbon steel wire
Galvanized wire
Tire steel wire
Stainless steel wire
Hose steel wire
Spring steel wire
Welding wire
Aluminum pole
Copper wire
Main Parameter
Spec | Drawing Path Times | Max. Wire Coming | Min. Wire Outing | Motor Power | Max. Speed | Running Form |
650 | 1-4 | 8.0mm | 4.0mm | 22-15KW | 2 | Gear Running |
560 | 1-7 | 6.5mm | 2.0mm | 22-11KW | 6 | Gear Running |
450 | 1-7 | 3.5mm | 1.2mm | 18.5-15KW | 7 | Gear Running |
400 | 6-8 | 2.5mm | 0.8mm | 11-15KW | 18 | Triangle Belt Running |
360 | 1-7 | 2.5mm | 0.6mm | 11-7.5KW | 8 | Gear Running |
Our Company
Anping County Hengtai Wire Mesh Machinery Factory has been established in 1999. Backed by 15 years experience
and vast knowledge, we are engaged in offering high quality Wire Mesh Machine to fulfill the needs of our customers.
Why Us?
1. Rich Domain Experience.
2. Professional Engineers.
3. More than 120 Workers.
4. With the occupying area of 6800 square meters.
5. Wide Business Network.
6. High Quality and Good After-sale Service.
7. Near Tianjin Port
Our Service
1. There is instruction bracket following the machines which is enough as a installation guide.
2. If necessary, we can also settle technician to help on installation and work training.
The customer should take charge for the visa, air ticket, worker's acccommodation in buyer's country and
worker's salary. (USD 100/day)
Guarantee
Except the wearing parts, 12 months guarantee for machine and 6 months guarantee for electric appliance after
shipment. During guarantee time, if the parts were broken caused by the product problem, seller will offer the parts by free.
FAQ
1. Q: What's the producing time and delivery time?
A.If we have stock, delivery to Tianjin port about 5 days, No stock, it wil be 25-35 days after received your
deposit.
2. Q: what's the packing of the machine?
A.In wooden pallet, In plastic film, the spare parts and cabinet packed by wooden box.
3. Q: What's the payment term?
A. Usually by T/T (30% in advance, the balance against the copy of B/L)
L/C is acceptable.
4. Q: How do your control quality?
A. We have an inspection team to check the products at all stages of the manufacturing process-raw material,
welding process and test the finished products, etc. 100% inspection in assemby line to achieve the required
quality levels.