CO2 Pressure Regulator Regulator MIG Wig Mag Welding Device

Min.Order: 50
Product origin: Jinhua, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 4.69 ~ 9.58

Description

Pressure reducer inert gas Argon/CO2

  1, Technical datas:
 




 


 

PRESSURE REDUCER

  • Bottle connection: W 21.0 x 1/14 "

  • The left display shows the filling quantity of the gas bottle in cash

  • right display shows the flow rate in l / min

  • right controller (small) opens and closes the flow (open right / left close)

  • lower regulator (large) sets the flow rate a (increase right / reduce left)

  • Tip: the average amount of shielding gas (argon 4.6) For TIG welding, it is 8-10 in a calm room l / min

  • Tip: the rule of thumb applies to MIG / MAG welding Wire diameter x 10 results in the optimal flow rate l / min
     

ApplicationArgon, Co 2, protective gas, mixed gas
Bottle connectionW 21.8 x 1/14 "
Hose tube5-7mm
Materialbrass
Weight540g
Dimensionsapprox. 11x11x11 cm
Flow rate0-20 l / min
max. Pressure bottle manometer300 bar



Company Profile

Derkia Automation Technology Co.,Ltd is the global market leader in pressure gauge, gas regulator and temperature measurement technology. We work with our customers to develop comprehensive solutions based on our high-quality measurement technology components, which are ultimately integrated into their business processes. The products include pressure gauges, gas pressure regulator, pressure switches, thermometers and more, we always provide solutions for pressure and temperature measurement and control systems. We deliver millions of quality products to more than 100 countries every year. With advanced equipment and excellent management, we have won a good reputation from all customers.



Packaging & Shipping







 
FAQ

Q:What do I need for offering a quote?
A: Please offer us product photo,quantity,application,or samples.Then we will quote the best price within 24 hours for you.

Q:How about the MOQ?
A:MOQ depends on your need ,besides,we welcome trial order before mass-production.

Q:What is the delivery time?
A:Usually it takes 15-25days after customer confirms the order.

Q:What kind of payment terms do you accept?
A:T/T,L/C,Escrow,paypal,western union,moneygram.

Q:Is it possible to know how is my product going on without visiting our company?
A:We will offer a detailed products schedule and send weekly reports with  digital pictures and vedios which show the machining progress.

Product Tag:
Related categories:
Scroll to Top