Fire-Fighting Machinery Geological and Meteorological Disaster Rescue Equipment Zl321 Emergency Assembly Bridge for Sale

Min.Order: 1
Product origin: Beijing, China
Infringement complaint: complaintComplaint
US$ 10000 ~ 200000

Description
Emergency assembly bridge
ZL321
  • Net width of the bridge deck(m)
    3.7
  • Bridge repellent beam channel length(m)
    9~63(in 3m increments)
  • Passability(km/h)
    30 (truck)/5 (crawler)/5 (semi trailer)

 

 
ZL321 Emergency assembly bridge PRODUCT FEATURE

Geological and meteorological disaster rescue equipment
It is suitable for disaster rescue work caused by various types of debris flows, landslides, earthquakes, droughts, freezing, etc., including emergency monitoring equipment, rescue and disposal equipment, and its products cover emergency bridge erection vehicles, emergency assembled bridges, etc

ZL321 Emergency assembly bridge PRODUCT INTRODUCTION

ZL321 emergency assembly bridge
      Zoomlion brand ZL321 emergency assembly bridge is a kind of decomposable, quickly erected, used to cross terrain obstacles or rush repair, composed of steel components; It can be formed into temporary bridges, emergency bridges and fixed bridges of various varieties and various uses according to the actual needs of different spans and loads. A set of equipment can erect 9, 12, 15... One-way street bridges with a span of 60 and 63 meters and a roadway width of 3.7 meters pass the load of automobile class 10, automobile level 15, automobile class 20, crawler level 50, trailer class 80.

Product highlights
Flexible assembly
10 combination forms, 9~63m bridge length, super rescue adaptability: 3 meters incremental span, can be formed according to the actual different spans, through load needs to form various types and various uses of temporary bridges, emergency bridges and fixed bridges.
Good passability
The width of the roadway is 37 meters, and it can pass the load of car class 10, car class 15, car class 20, track class 50, trailer class 80.
All-steel component structure and simple maintenance
It is made of high-strength steel fully welded, and the frame unit is connected by a single pin or bolt; Large bearing capacity, strong structural rigidity, long fatigue life; Simple structure, light components, convenient transportation; Flexible combination, quick erection, easy disassembly and assembly, good interchangeability, components can be reused.
Fire-fighting Machinery ZL321 Emergency assembly bridge


Zoomlion Technical parameters of ZL321 Emergency assembly bridge
performanceUnitparameter
Net width of the bridge deckm3.7
Bridge repellent beam channel lengthm9~63(in 3m increments)
Bridge trusses are highm1.4
Bridge deck/Steel deck
Bridge combination form/Single-row single-layer, double-row single-layer, three-row single-layer, double-row, double-layer, three-row double-layer, and each corresponding reinforced type
Bridge carrying capacitytDifferent span combinations can pass the load of car level 10, car level 15, car class 20, track level 50, trailer class 80
Passabilitykm/h30 (car)/5 (track)/5 (trailer)
The maximum vertical deflection in the 21-meter double-row single-layer span is lower than the span ratiokg1/300
trusskg270
Truss pinskg3
Strengthen the chordkg80
crossbeamkg245
U-shaped standard steel bridge deckkg210
U-shaped central steel bridge deckkg130
Male end columnkg69
Pubic end columnkg70
U-shaped bridgehead deckkg220
 
Pictures show
Product Tag:
Related categories:
Scroll to Top